ARSD 74:32:05:08.02

ARSD 74:32:05:08.02. Assessment workplan -- Contents

Last amended: 1997Year: 2026Length: 173 wordsOfficial source

Cite as S.D. Admin. R. 74:32:05:08.02

An assessment workplan must contain the following provisions: (1) A brief summary of the nature of the work to be completed and the sequence of planned activities; (2) A proposed time schedule for commencing and completing major activities, including the release investigation report; (3) A written discussion of the rationale for selecting the number and placement of monitoring wells and soil borings; (4) A written discussion of the rationale for selecting which water and soil samples will be retained for laboratory analysis; (5) The names of the constituents for which a laboratory analysis is to be performed; (6) The method used for determining the direction of local groundwater flow; (7) A brief summary of the quality assurance and quality control plan which will be followed during the release investigation; (8) A description of all computer models that may be used in the pathway and fate analysis, costs analysis of remedial alternatives, design of remedial alternatives, or risk assessment; and (9) Other provisions the director or department determine to be necessary for the assessment.
ARSD 74:32:05:08.02: ARSD 74:32:05:08.02. Assessment workplan -- Contents | Justis AI