1680-05-02-.04
Staffing, Training And Certification Requirements
Cite as Tenn. Comp. R. & Regs. 1680-05-02-.04
At the discretion of the Commissioner, highway construction contractors may be required to meet the
following staffing, training and certification requirements in order to qualify as a responsible bidder on
proposal contracts for the construction of highway projects involving earthwork within or in close proximity
to high quality waters or impaired waters of the State of Tennessee. Nothing in these rules shall be construed
to limit the Commissioner’s discretion to impose other or additional staffing, training or certification
requirements, or other or additional contract specifications, in particular construction contracts where the
Commissioner determines that it is in the best interest of the State to do so.
(1)
Staffing Requirements.
(a)
The contractor may be required to employ one or more persons as necessary who shall be
specifically assigned to the project to perform the duties of an erosion prevention and sediment
control inspector. In the absence of any provision in the construction contract to the contrary,
the contractor may elect to meet this requirement either by assigning the duties of the erosion
prevention and sediment control inspector to one or more of its own employees or by assigning
these duties to a subcontractor or consultant. At a minimum, each erosion prevention and
sediment control inspector shall have successfully completed the training identified in
paragraph (2) of this rule below.
(b)
The duties of the erosion prevention and sediment control inspector may include the following:
1.
The inspector shall perform all inspections required under section IV.D.4 of the General
Permit and such additional inspections as may be required under the construction
contract. At a minimum, such inspections shall be performed before anticipated storm
events and within 24 hours after the end of a storm event of 0.5 inches or greater rainfall,
CONTRACTOR QUALIFICATIONS FOR CONSTRUCTION IN
CHAPTER 1680-5-2
HIGH QUALITY OR IMPAIRED WATERS
and in any event at least once per week, or at such more frequent intervals as may be
required under the General Permit or the construction contract.
2.
Based on the results of the inspections, and subject to the overall supervision of the
contractor’s environmental supervisor, the inspector shall identify any erosion prevention
and sediment control measures that are in disrepair or otherwise functioning
inadequately. The inspector shall also report to the environmental supervisor any
modifications that may need to be made in the project’s storm water pollution prevention
plan, as provided in section IV.D.4, subsections f and g, of the General Permit and as
may be further required in the construction contract.
3.
The inspector shall document the inspections by preparing Construction Storm Water
Inspection Reports, as provided in section IV.D.4, subsection h, of the General Permit,
and as may be further required in the construction contract. These Inspection Reports
shall be documented on forms approved by the Department.
(c)
In addition, the contractor may be required to employ one or more persons as necessary who
shall be specifically assigned to the project to perform the duties of environmental supervisor
for the contractor. In the absence of any provision in the construction contract to the contrary,
the contractor may elect to meet this requirement either by assigning the duties of the
environmental supervisor to one or more of its own employees or by assigning these duties to a
subcontractor or consultant. At a minimum, the contractor’s environmental supervisor(s) shall
have successfully completed the training identified in paragraph (2) of this rule below.
(d)
The duties of the contractor’s environmental supervisor may include the following:
1.
The environmental supervisor shall have responsibility for the overall operation of the
project’s construction activities that are regulated under the General Permit or any other
Water Quality Permit.
2.
The environmental supervisor shall be responsible for implementing the project’s storm
water pollution prevention plan and otherwise ensuring compliance with the General
Permit and any other Water Quality Permits.
3.
The environmental supervisor shall be authorized to sign and shall be responsible for
signing the certifications on all Construction Storm Water Inspection Reports, as
provided in section III.F.3 of the General Permit and as may be further provided in any
Water Quality Permit or the construction contract. These Inspection Reports shall be
submitted to the Department’s project supervisor and/or to such other persons as the
Department may determine.
4.
The environmental supervisor shall supervise the erosion prevention and sediment
control inspector(s) and ensure that the inspector’s duties are fully and timely performed.
5.
Based on the results of the inspections performed by the erosion prevention and sediment
control inspector(s), the environmental supervisor shall recommend to the Department
any modifications that may need to be made in the project’s storm water pollution
prevention plan.
6.
The environmental supervisor shall be responsible for ensuring that the erosion
prevention and sediment control measures on the project are properly maintained,
repaired or replaced as required under any Water Quality Permit, including the General
Permit, and as may be further required in the construction contract.
CONTRACTOR QUALIFICATIONS FOR CONSTRUCTION IN
CHAPTER 1680-5-2
HIGH QUALITY OR IMPAIRED WATERS
7.
The environmental supervisor shall have the authority and responsibility to stop
earthwork at any disturbed site on the project where the erosion prevention and sediment
control measures are proving ineffective in eliminating or significantly minimizing the
runoff of soil or other pollutants in storm water discharges or are otherwise not achieving
the general objectives of controlling pollutants in storm water discharges associated with
construction activities until such time as the erosion prevention and sediment control
measures can be repaired or modified to achieve these objectives.
(2)
Training Requirements.
(a)
As a minimum, the contractor’s erosion prevention and sediment control inspector(s) shall have
successfully completed the following training within the past five years:
1.
TDEC’s “Fundamentals of Erosion Prevention and Sediment Control,” or its successor;
or
2.
A beginner level class in storm water management and construction site inspection
offered by the International Erosion Control Association; or
3.
A comparable course from another source, subject to Department approval.
(b)
As a minimum, the contractor’s environmental supervisor(s) shall have successfully completed
the same basic training required for the contractor’s erosion prevention and sediment control
inspector as provided in subparagraph (a) above, and within the past five years the contractor’s
representative shall have successfully completed the following additional training:
1.
TDEC’s “Design Principles for Erosion Prevention and Sediment Control,” or its
successor; or
2.
An intermediate or advanced level course in storm water management and construction
site inspection offered by the International Erosion Control Association; or
3.
A comparable intermediate or advanced level course from another source, subject to
Department approval.
(3)
Certification Requirements.
(a)
The contractor’s bid shall include a certification stating that the contractor is able to provide and
will provide personnel to perform the duties of the erosion prevention and sediment control
inspector and the environmental supervisor, as set forth in paragraph (1) above or as otherwise
set forth in the Department’s proposal contract, and who have fulfilled the training requirements
set forth in paragraph (2) above. After a contractor has been awarded a contract, the contractor
shall certify to the Department the identity of the persons who will perform the duties of the
erosion prevention and sediment control inspector and environmental supervisor, and the
contractor’s certification shall include documentation to verify the content and date of the
training. This certification shall be made in writing at or before the preconstruction meeting
and thereafter as necessary whenever the contractor makes a change in the persons fulfilling
these duties.
(b)
The contractor’s bid shall also include a certification identifying all enforcement orders issued
against the contractor within the past twenty-four (24) months for violations of the Federal
Water Pollution Control Act, the Tennessee Water Quality Control Act, or any other State’s
CONTRACTOR QUALIFICATIONS FOR CONSTRUCTION IN
CHAPTER 1680-5-2
HIGH QUALITY OR IMPAIRED WATERS
water quality control act. At the discretion of the Commissioner, and as set forth in the
specifications of the proposal contract, serious violations of any such act may be deemed a
sufficient ground for finding that a contractor is not a responsive bidder on that project.
(c)
If the Commissioner makes an initial determination that a contractor – who is otherwise
responsive and the apparent low bidder – should not be considered a responsive bidder based on
the certification concerning enforcement orders, the Commissioner shall provide written notice
of this initial determination and give the contractor an opportunity for an informal meeting to
show why the contractor should nevertheless not be considered non-responsive. This informal
meeting shall be held within twenty (20) calendar days after the date of the contract bid opening
and may be conducted by the Commissioner or the Commissioner’s designee(s). After
considering the information presented by the contractor in the informal meeting, the
Commissioner shall make a final determination as to whether the contractor shall be considered
a responsive bidder on the project. Written notice of the final determination shall be given to
the contractor. The Commissioner’s decision shall be final and not subject to appeal.
(d)
A final determination by the Commissioner that a contractor is not a responsive bidder on a
particular project as provided in this rule shall not, by itself, be considered a disqualification
from bidding on any other proposal contract with the Department.
(e)
Falsification of any certification required under these rules may be deemed a sufficient ground
for finding that a contractor is not a responsive bidder, and if a falsified certification is
submitted after a contract has been awarded it shall be deemed a breach of contract to be dealt
with as provided in the contract.