1680-09-01-.05
Procedures For Approvals And Inspections
Cite as Tenn. Comp. R. & Regs. 1680-09-01-.05
(1)
Application Requirement.
(a)
Whenever any person, railroad company, or governmental entity other than the Department
proposes the construction of a public crossing, as defined in these Rules, or the conversion of a
private crossing to a public crossing, as defined in these Rules, the person, railroad company or
governmental entity proposing the construction or conversion must submit a written
application for approval of the plans to the Rail Safety Office, or to such other office of the
Department as the Commissioner may designate.
(b)
The current address of the Rail Safety Office is Suite 1800, James K. Polk Building, 505
Deaderick Street, Nashville, Tennessee 37243, and the current telephone number is (615) 741-
1341; however, the address and telephone number of the Rail Safety Office may be subject to
change without amendment of these Rules.
(2)
Information Required in Application.
RAILROAD GRADE CROSSING STANDARDS
CHAPTER 1680-9-1
The applicant shall provide all relevant information regarding the proposed construction or
conversion of the grade crossing, as determined by the Department. At a minimum, unless the
Department expressly waives any item of information, the application shall contain:
(a)
The name, address, and telephone number of the applicant, and the identity of the contact
person;
(b)
The name and address of the railroad company that owns and/or operates trains on the track(s)
at the grade crossing, and the identity of the contact person, if known;
(c)
The name and address of the governmental entity having jurisdiction, or which will have
jurisdiction, over the roadway at the grade crossing, and the identity of the contact person;
(d)
Maps or other documentation showing:
1.
The general and specific location of the proposed construction or conversion of the
grade crossing;
2.
The USDOT-AAR crossing inventory number, if assigned, and the railroad milepost
number for the crossing;
3.
The geodetic coordinates of the grade crossing;
4.
Existing patterns of traffic for:
(i)
emergency vehicles;
(ii)
school buses;
(iii)
vehicles carrying hazardous materials; and
(iv)
trucks;
5.
The distance in each direction along the roadway to any public road intersection within
2,500 feet of the grade crossing, the type of public roads, and the type of roadway signs
and markings and/or traffic control devices, if any, at each such intersection; and
6.
The distance in each direction along the railroad track(s) to any public road intersection
within one mile of the grade crossing, the type of public roads, the type of crossing
(grade crossing or grade separation), and the type of passive warning devices and/or
active warning devices, if any, at each such crossing;
7.
The distance in each direction along the railroad track(s) to any intersection or junction
with another railroad track within two miles of the grade crossing;
8.
Sight distance calculations, consistent with the AASHTO Design Manual, for the
presence of any objects or features that obstruct the view from a vehicle on the roadway
to the grade crossing or the approaching train;
(e)
Plans for the construction or conversion showing:
RAILROAD GRADE CROSSING STANDARDS
CHAPTER 1680-9-1
1.
The present and proposed grade and alignment of the roadway within 500 feet of the
grade crossing, or within 100 feet beyond the limit of work, whichever is less;
2.
The present and proposed grade and alignment of the railroad track(s) within 200 feet of
the grade crossing;
3.
The present and proposed right-of-way limits of the roadway and railroad at the grade
crossing; and
(f)
Construction details, including but not limited to the typical roadway cross-section;
(g)
The temporary traffic control plan, or plan for the detour of vehicular traffic, during
construction;
(h)
The proposed schedule of construction or conversion;
(i)
The existing ADT and the projected 5-year and 20-year ADT on the roadway at the grade
crossing;
(j)
The percentage of trucks at the grade crossing;
(k)
The design speed of the roadway and the posted speed limits of vehicles using the roadway at
the grade crossing;
(l)
The existing frequency of trains, types of trains (passenger, freight or switching), and the
maximum and average speeds of trains using the railroad track(s) at the grade crossing;
(m)
The existing and proposed roadway signs, markings, or other traffic control devices, and any
existing and/or proposed passive warning devices, active warning devices and
interconnections, at the grade crossing; and
(n)
A list of any alternatives to the proposed construction or conversion that have been considered
by the applicant, including but not limited to the feasibility of a grade separation rather than
at-grade crossing.
(3)
Preparation of Plans by Registered Engineer.
All engineering plans, specifications and calculations required by the Department, as in
subparagraphs (2)(d) through (2)(n) above, shall be prepared by a registered engineer licensed in the
State of Tennessee.
(4)
Review of Applications.
(a)
Upon receipt of an application, together with the required application fee as described in Rule
1680-9-1-.07 below, the Rail Safety Office, or such other office of the Department as the
Commissioner may designate, shall promptly send notice of the application to the railroad
company that owns and/or operates trains on the track(s) and the governmental entity having
or which will have jurisdiction over the roadway at the location of the proposed construction or
conversion of the grade crossing.
(b)
The Rail Safety Office, or other designated office, shall review the application for the proposed
construction or conversion in accordance with the standards established in these Rules. That
office may obtain the assistance of other employees within the Department as it may deem
RAILROAD GRADE CROSSING STANDARDS
CHAPTER 1680-9-1
appropriate, and, in accordance with any contract approved by the Commissioner, it may
obtain the services of an independent consultant to assist in reviewing the application.
(c)
The Rail Safety Office, or other designated office, may determine, after reviewing the
application or upon the request of the affected local government or affected railroad, that a
field review by a diagnostic team is appropriate in order to conduct an adequate investigation
and review of the proposed construction or conversion. The diagnostic team shall include such
employees of the Department, or independent consultants hired by the Department, and such
other persons, including employees of the affected local government and the affected railroad,
as the Rail Safety Office, or other designated office, may deem appropriate in each case.
(d)
Upon completing such review, the Rail Safety Office, or other designated office, shall make a
preliminary recommendation to approve, reject, or request a modification of the proposed
construction or conversion in accordance with the standards established in these Rules. The
applicant shall be given notice of this preliminary recommendation and an opportunity, not to
exceed 30 days, in which to respond to the preliminary recommendation.
(e)
The preliminary recommendation shall also be submitted to the FHWA, the affected local
government, and the affected railroad, if different than the applicant, and these entities shall be
given an opportunity, not to exceed 30 days, in which to review and comment on the
application and the Department’s preliminary recommendation.
(f)
The Rail Safety Office, or other designated office, shall consider any response received from
the applicant and any comments received from the FHWA, the affected local government, and
the affected railroad, if different from the applicant. Upon completing this final review and
consideration, the Rail Safety Office, or other designated office, shall make a final
recommendation to the Commissioner to approve, reject or modify the proposed construction
or conversion.
(g)
Upon receiving the final recommendation, the Commissioner shall make the decision to
approve or reject the proposed construction or conversion, or to approve the proposed
construction or conversion subject to modification. The Commissioner’s decision shall be
final. Notice of the Commissioner’s decision shall be given to the applicant, the affected local
government, and the affected railroad, if different from the applicant.
(h)
Upon receiving the Commissioner’s decision, the applicant shall notify the Rail Safety Office,
or other designated office, regarding the applicant’s intent to proceed with the construction or
conversion as approved by the Department, including the date upon which the construction or
conversion is expected to begin. The applicant shall also send a copy of this notice to the
affected local government and the affected railroad, if different from the applicant.
(5)
Construction or Conversion by the Department.
(a)
In the case of any construction or conversion of a grade crossing proposed by the Department,
the Department shall conduct an internal review of the proposed construction or conversion to
assure compliance with the standards established under these Rules. This internal review shall
be conducted in accordance with such policies and procedures as the Commissioner may deem
appropriate. If the Department determines that a field review by a diagnostic team is
appropriate in any particular case, the diagnostic team may include employees of the affected
railroad and/or affected local government, if any, as well as employees or consultants of the
Department and, where appropriate, representatives of FHWA.
RAILROAD GRADE CROSSING STANDARDS
CHAPTER 1680-9-1
(b)
Before making a final decision to proceed with the proposed construction or conversion, the
Department shall submit its proposal to the FHWA, the affected local government, and the
affected railroad for review and comment as provided in paragraph (4)(e) above.
(6)
Inspections.
(a)
At or near the completion of the proposed construction or conversion, the applicant shall notify
the Rail Safety Office, or other designated office, of the completion date and request a final
inspection before opening the completed grade crossing to vehicular traffic.
(b)
The Rail Safety Office, or other designated office, shall perform a final inspection to assure
that the construction or conversion of the grade crossing has been completed in accordance
with the plans approved by the Department. That office may obtain the assistance of other
employees within the Department as it may deem appropriate, and, in accordance with any
contract approved by the Commissioner, it may obtain the services of an independent
consultant to assist in performing the inspection. The Department shall charge the applicant
an inspection fee, as provided in Rule 1680-9-1-.07 below.
(c)
Upon completing the final inspection, the Rail Safety Office, or other designated office, shall
send a written notice to the applicant, with a copy to the affected local government and the
affected railroad, if different from the applicant, stating that:
1.
The construction or conversion has been completed in accordance with the plans
approved by the Department and may be opened to vehicular traffic; or
2.
The construction or conversion has not been completed in accordance with the plans
approved by the Department and may not be opened to vehicular traffic. In such a case,
the Department shall identify the deficiency in the construction or conversion that the
applicant must correct before the grade crossing may be opened to vehicular traffic.
Upon correcting the deficiency, the applicant shall so notify the Department and again
request a final inspection, subject to payment of an inspection fee, as provided in this
Rule.