0800-03-03-.11
Existing Heating Boilers
Cite as Tenn. Comp. R. & Regs. 0800-03-03-.11
(1)
Standard Boilers. The maximum allowable working pressure of standard boilers shall in no
case exceed the pressure indicated by the manufacturer’s identification stamped or cast on
the boiler or on a plate secured on it.
(2)
Nonstandard Riveted Boilers. The maximum allowable working pressure on the shell of a
nonstandard riveted heating boiler shall be determined in accordance with Rule 0800-03-03-
.10(3) except that in no case shall the maximum allowable working pressure of a steam
heating boiler exceed 15 psig, or a hot water boiler exceed 160 psig or 250°F.
(3)
Nonstandard Welded Boiler. The maximum allowable working pressure of a nonstandard
steel or wrought iron heating boiler of welded construction shall not exceed 15 psig for steam.
For other than steam service, the maximum allowable working pressure shall be calculated in
accordance with ASME Code, Section IV but in no case shall it exceed 30 psig.
(4)
Nonstandard Cast Iron Boilers.
(a)
A maximum allowable working pressure of a nonstandard boiler composed principally
of cast iron shall not exceed 15 psig for steam service or 30 psig for hot water service.
(b)
The maximum allowable working pressure of a nonstandard boiler having cast iron
shell or heads and steel or wrought iron tubes shall not exceed 15 psig for steam
service or 30 psig for hot water service.
(5)
Safety Valves.
(a)
Each steam boiler shall have one (1) or more ASME/NB stamped safety valves of the
spring pop-type adjusted and sealed to discharge at a pressure not to exceed 15 psig.
Seals shall be attached in a manner to prevent the valves from being taken apart
without breaking the seal. The safety valves shall be arranged so that they cannot be
reset to relieve at a higher pressure than the maximum allowable working pressure of
the boiler. A body drain connection below seat level shall be provided by the
manufacturer and this drain shall not be plugged during or after field installation. For
valves exceeding two and one half (2½) inches pipe size, the drain holes or holes shall
be tapped not less than three-eighths (3/8) inch pipe size. For valves less than two and
one half (2½) inches, the drain hole shall not be less than one-fourth (1/4) inch in
diameter.
(b)
No safety valve for a steam heating boiler shall be smaller than one half (1/2) inch
unless the boiler and radiating surface consist of a self-contained unit. No safety valve
shall be larger than four and one half (4½) inches. The inlet opening shall have an
inside diameter equal to, or greater than, the seat diameter.
(c)
The minimum relieving capacity of the valve or valves shall be governed by the
capacity marking on the boiler.
(d)
The minimum valve capacity in pounds per hour shall be the greater of that determined
by dividing the maximum BTU output at the boiler nozzle obtained by the firing of any
fuel for which the unit is installed by one thousand (1000) or shall be determined on the
basis of the pounds of steam generated per hour per square foot of boiler heating
surface as given in Table 2. In many cases, a greater relieving capacity of valves will
BOILER INSPECTIONS
CHAPTER 0800-03-03
have to be provided than the minimum specified by these rules. In every case, the
requirements of subparagraph (e) of this rule shall be met.
Table 2
Minimum Pounds of Steam Per Hour
Per Square Foot of Heating Surface
Firetube
Boilers
Watertube
Boilers
Boiler Heating Surface:
Hand fired
Stoker fired
Oil, gas or pulverized fuel fired
Waterwall Heating Surface:
Hand fired
Stoker fired
Oil, gas or pulverized fuel fired
1.
When a boiler is fired only by a gas giving a heat value not in excess of 200 BTU
per cubic foot, the minimum safety valve or safety relief valve relieving capacity
may be based on the value given for hand fired boilers above.
2.
The minimum safety valve or safety relief valve relieving capacity for electric
boilers shall be three and one half (3½) pounds per hour per kilowatt input.
3.
For heating surface determination, see ASME Code, Section IV, Paragraph HG-
403.
(e)
The safety valve capacity for each steam boiler shall be such that, with the fuel-burning
equipment installed and operating at maximum capacity, the pressure cannot rise more
than 5 psig above the maximum allowable working pressure.
(f)
When operating conditions are changed, or when additional boiler heating surface is
installed, the valve capacity shall be increased (if necessary) to meet the new
conditions and comply with this paragraph. When additional valves are required, they
may be installed on the outlet piping, provided there is no intervening valve.
(g)
If there is any doubt as to the capacity of the safety valve, an accumulation test shall be
run. See ASME Code, Section VI, Recommended Rules for Care and Operation of
Heating Boilers.
(h)
No valve of any description shall be placed between the safety valve and the boiler,
and on the discharge pipe between the safety valve and the atmosphere. The
discharge pipe shall be at least full-size, and shall be fitted with an open drain to
prevent water lodging in the upper part of the safety valve and in the discharge pipe.
When an elbow is placed on the safety valve discharge pipe, it shall be located close to
the safety valve outlet; and the discharge pipe shall be securely anchored and
supported. All safety valve discharges shall be so located and piped as not to endanger
persons in the area.
(6)
Safety Relief Valve Requirements for Hot Water Boilers.
BOILER INSPECTIONS
CHAPTER 0800-03-03
(a)
Each hot water heating boiler shall have at least one (1) ASME/NB stamped safety
relief valve set to relieve at or below the maximum allowable working pressure of the
boiler. Each hot water supply boiler shall have at least one (1) ASME/NB stamped
safety relief valve of the automatic reseating type set to relieve at or below maximum
allowable working pressure of the boiler safety relief valves, ASME/NB stamped as to
capacity, shall have pop action when tested by steam. When more than one (1) safety
relief valve is used on either hot water heating or hot water supply boilers, the
additional valve or valves shall be ASME/NB rated, and may be set within a range not
to exceed 6 psig above the maximum allowable working pressure of the boiler up to
and including 60 psig, and five percent (5%) for those having a maximum allowable
working pressure exceeding 60 psig. Safety relief valves shall be spring loaded. Safety
relief valves shall be so arranged that they cannot be reset at a higher pressure than
the maximum permitted by this subparagraph.
(b)
No materials liable to fail due to deterioration or vulcanization when subject to
saturated steam temperature corresponding to capacity test pressure shall be used for
any part.
(c)
No safety relief valve shall be smaller than three-fourths (3/4) inch nor larger than four
and one half (4½) inches standard pipe size, except that boilers having a heat input not
greater than 15,000 BTU per hour may be equipped with a safety relief valve of one
half (1/2) inch standard pipe. The inlet opening shall have an inside diameter
approximately equal to, or greater than, the seat diameter. In no case shall the
minimum opening through any part of the valve be less than one-fourth (1/4) inch in
diameter or its equivalent area.
(d)
The required steam relieving capacity, in pounds per hour, of the pressure relieving
device or devices on a boiler shall be the greater of that determined by dividing the
maximum output in BTU at the boiler nozzle obtained by the firing of any fuel for which
the unit is installed by one thousand (1,000) or shall be determined on the basis of
pounds of steam generated per hour per square foot of boiler heating surface as given
in Table 2. In many cases, a greater relieving capacity of valves will have to be
provided than the minimum specified by these rules. In every case, the requirements of
subparagraph (f) of this rule shall be met.
(e)
When operating conditions are changed, or when additional boiler heating surface is
installed, the valve capacity shall be increased, if necessary, to meet the new
conditions and shall be in accordance with Table 2 and subparagraph (f) of this rule.
The additional valves required, on account of changed conditions, may be installed on
the outlet piping provided there is no intervening valve.
(f)
The safety relief valve capacity for each boiler shall be such that, with the fuel burning
equipment installed and operating at maximum capacity, the pressure cannot rise more
than 5 psig above the maximum allowable working pressure for steam heating boilers,
and ten percent (10%) above maximum allowable working pressures for hot water
boilers.
(g)
If there is any doubt as to the capacity of the safety relief valve, an accumulation test
shall be run. See ASME Code, Section VI. Recommended Rules for Care and
Operation of Heating Boilers.
(h)
No valve of any description shall be placed between the safety relief valve and the
boiler, and on the discharge pipe between the safety relief valve and the atmosphere.
The discharge pipe shall be at least full-size, and shall be fitted with an open drain to
prevent water lodging in the upper part of the safety relief valve or in the discharge
pipe. When an elbow is placed on the safety relief valve discharge pipe, it shall be
BOILER INSPECTIONS
CHAPTER 0800-03-03
located close to the safety relief valve outlet; and the discharge pipe shall be properly
supported. All safety relief valve discharges shall be so located and piped as not to
endanger persons in the area.
(7)
Steam Gauges.
(a)
Each steam boiler shall have a steam gauge connected to its steam space, its water
column, or its steam connection, by means of a siphon or equivalent device exterior to
the boiler. The siphon (or equivalent device) shall be a sufficient capacity to keep the
gauge tube filled with water and shall be so arranged that the gauge cannot be shut off
from the boiler except by a cock with tee or lever handle placed in the pipe near the
gauge. The handle of the cock shall be parallel to the pipe in which it is located when
the cock is open.
(b)
The scale on the dial of a steam gauge shall be graduated to not less than 30 psig - nor
more than 60 psig. The gauge shall be provided with effective stops for the indicating
pointer at the zero (0) point and at the maximum pressure point. The travel of the
pointer from zero (0) to 30 psig pressure shall be at least three (3) inches.
(8)
Pressure or Altitude Gauge and Thermometers.
(a)
Each hot water heating or hot water supply boiler shall have a pressure or altitude
gauge connected to it or to its flow connection in such a manner that it cannot be shut
off from the boiler except by a cock with tee or lever handle, placed on the pipe near
the gauge. The handle of the cock shall be parallel to the pipe in which it is located
when the cock is open.
(b)
The scale on the dial of the pressure or altitude gauge shall be graduated
approximately to not less than one and one half (1½) nor more than three and one half
(3½) times the pressure at which the safety relief valve is set. See NBIC Part 1, Section
3.8.2.1.
(c)
Piping or tubing for pressure or altitude gauge connections shall be of nonferrous metal
when smaller than one (1) inch pipe size.
(d)
Each hot water boiler shall have a thermometer so located and connected that it will be
easily readable when observing the water pressure or altitude gauge. The thermometer
shall be so located that it will at all times indicate the temperature in degrees
Fahrenheit of the water in the boiler at or near the outlet.
(9)
Water Gauge Glasses.
(a)
Each steam boiler shall have one (1) or more water gauge glasses attached to the
water column or boiler by means of valved fittings. The lower fitting shall be provided
with a drain valve of the straightaway type, with opening not less than one-fourth (¼)
inch diameter to facilitate cleaning. Gauge glass replacement shall be possible while
the boiler is under pressure.
(b)
Transparent material, other than glass, may be used for the water gauge, provided that
the material has proven suitable for the pressure temperature and corrosive conditions
encountered in service.
(10) Stop Valves and Check Valves.
BOILER INSPECTIONS
CHAPTER 0800-03-03
(a)
If a boiler may be closed off from the heating system by closing a steam stop valve,
there shall be a check valve in the condensate return line between the boiler and the
system.
(b)
If any part of a heating system may be closed off from the remainder of the system by
closing a steam stop valve, there shall be a check valve in the condensate return pipe
from the part of the system.
(11) Feedwater Connections.
(a)
Feedwater, make-up water, or water treatment shall be introduced into a boiler through
the return piping system or through an independent feedwater connection which does
not discharge against parts of the boiler exposed to direct radiant heat from the fire.
Feedwater, make-up water, or water treatment shall not be introduced through
openings or connections provided for inspection or cleaning, safety valve, safety relief
valve, surface blowoff, water column water gauge glass, pressure gauge or
temperature gauge.
(b)
The feedwater pipe shall be provided with a check valve near the boiler and a stop
valve or cock between the check valve and the boiler or return pipe system.
(12) Return Pump. Each boiler equipped with a condensate return pump shall be provided with a
water level control arranged to automatically maintain the water level in the boiler within the
range of the gauge glass.
(13) Repairs and Renewals of Fittings and Appliances. Whenever fittings or appliances are