1220-04-01-.13
Extensions Of Service To Contiguous Territory
Cite as Tenn. Comp. R. & Regs. 1220-04-01-.13
(1)
For purposes of this Rule, “contiguous” means immediately adjacent, and sharing at least
one significant common boundary line. A geographic feature such as a roadway or stream
along the common boundary line will not negate contiguity. However, any intervening land or
significant body of water will disqualify a territory from being contiguous. An extension that
traverses unoccupied territory that will not be served by the extension is not contiguous.
(2)
Neither a Certificate of Public Convenience and Necessity (“CCN”) nor an amendment to an
existing CCN shall be required for the extension of public utility service into territory that is
contiguous to the territory occupied by such public utility’s plant, route, line, or system, when:
(a)
The contiguous territory is not receiving similar service from another utility service
provider; and,
(b)
The contiguous territory is not located within the designated service territory of another
utility providing similar service.
GENERAL PUBLIC UTILITY RULES
CHAPTER 1220-04-01
(3)
A public utility shall provide written notice to the Commission of its intention to construct,
acquire, or commence operation of a utility system or service in territory that is contiguous to
the service territory already designated to the public utility for the provision of service of a like
character. Concerning such written notice, the public utility shall:
(a)
File notice with the docket clerk for the Commission at least thirty (30) days before
constructing, acquiring, or commencing operation of such utility system or service; and,
(b)
Provide notice in a form approved by the Commission; which shall include identification
of the area to be served by the extension and other information required by the
Commission in the performance of its statutory general supervisory and regulatory
duties.
(4)
In addition to the written notice to the Commission required by paragraph three (3) herein, the
public utility shall provide to the Commission:
(a)
Proof of notice that may be required to any regulatory agency of the extension of
service of contiguous territory;
(b)
A complete description of the geographic contiguous territory to be served by the
expansion including the name and location of the development (subdivision), number of
acres, and the existing territory served by the utility proposing to expand its service
area. A legible map of the area with the proposed contiguous service territory and the
currently served territory shall also be provided.
(c)
Documentation of permits, permit modifications and/or amendments, or other approval
documents certifying the existence of appropriate capacity and/or ability to provide
service issued by any regulatory agency; and,
(d)
Documentation concerning any complaint(s), notices of violation, or administrative
action filed with or issued by a regulatory agency concerning the operations of the
utility plant, route, line, or system, to be extended. Such documentation shall also be
provided for any complaint(s), notices of violation, or administrative action filed with or
issued by a regulatory agency within sixty (60) days after the filing of the written notice
required by paragraph three (3) herein.
(5)
In addition to the requirements of paragraphs three (3) and four (4), a public wastewater utility
shall provide to the Commission:
(a)
Proof that the operating permit for the existing system has been modified and reissued
by the Tennessee Department of Environment and Conservation (“TDEC”) to reflect
the additional wasteload; or, demonstrate that the existing system design has capacity
to support the design flow of the original system and the design flow expected from the
contiguous area, and a public notice confirming that the public utility appropriately
announced its intention to serve the contiguous property at issue; and,
(b)
Certification from a design engineer that the existing wastewater system, before any
alteration needed to extend service, was constructed in accordance with TDEC-
approved construction plans and specifications. The certification shall be filed in the
docket prior to providing service.
(6)
Upon the filing of a written notice, the Commission shall open a docket for the review of the
notice. A commission order, including appropriate findings of fact and conclusions of law,
shall be entered not more than sixty (60) days from the filing of the written notice and all
required documentation, and shall be limited to whether the intended expansion qualifies as
an expansion into contiguous territory.