1220-04-03-.32

Initial Test And Storage Of Meters

Last amended: 2018Year: 2026Length: 52 wordsOfficial source

Cite as Tenn. Comp. R. & Regs. 1220-04-03-.32

(1) Every water meter shall be tested as required by these rules prior to its installation either by the manufacturer, the utility, or any approved organization equipped for meter testing. Meters with oil-enclosed gear trains should be stored in an inverted position, and, unless so stored, shall be tested immediately before installation.