1220-04-04-.28
Requirement For Good Engineering Practice
Cite as Tenn. Comp. R. & Regs. 1220-04-04-.28
(1)
The electric plant of the utility shall be constructed, installed, maintained and operated in
accordance with accepted good engineering practice in the electric industry to assure, as far
as reasonably possible, continuity of service, uniformity in the quality of service furnished,
and the safety of persons and property.