1220-04-04-.33

Post-Installation Inspections

Last amended: 2018Year: 2026Length: 68 wordsOfficial source

Cite as Tenn. Comp. R. & Regs. 1220-04-04-.33

(1) Post-installation inspections are to be made to determine proper operation and wiring connections and must be made within sixty (60) days after installation by a qualified person who, whenever possible, should be someone other than the original installer. The following equipment is subject to post-installation inspections: (a) Meters with associated instrument transformers and phase shifting transformers. (b) Kilovar-hour meters. (c) Demand meters. (d) Direct current watt-hour meters.
1220-04-04-.33: Post-Installation Inspections | Justis AI