1220-04-04-.49

Grounding Of Secondary Distribution System

Last amended: 2018Year: 2026Length: 96 wordsOfficial source

Cite as Tenn. Comp. R. & Regs. 1220-04-04-.49

(1) Unless otherwise specified by the Commission, each utility shall comply with, and shall require its customers to comply with, the applicable provisions in the National Electrical Safety Code and the National Electrical Code for the grounding of secondary circuits and equipment. (a) Ground connections should be tested for resistance at the time of installation unless multi-grounding is used. (b) The utility shall keep a record of all ground resistance measurements. (c) The utility shall establish a program of inspection so that all artificial grounds installed by it shall be inspected within reasonable periods of time.