1220-04-13-.04
Documents To Be Filed With The Commission
Cite as Tenn. Comp. R. & Regs. 1220-04-13-.04
(1)
The public wastewater utility shall file with the Commission the following documents and
information, and shall refile such documents to keep such information up-to-date.
(a)
A copy of the public wastewater utility’s tariff as specified in Rule 1220-04-01-.02 that
includes the rates, rules, terms, and conditions and that describes the policies and
practices in rendering service that conform to all applicable provisions shall be filed
with the Commission. Such tariff may also include cost recovery associated with
financial securities as described in these rules and recovery of the costs of bonding for
operation of the utility imposed by local governments.
(b)
Before initiation of service, the public wastewater utility shall file with the Commission
the TDEC approval of the design and permit for the wastewater system and proof that
the utility owns the land and/or has easements for the proposed wastewater system.
(c)
Each public wastewater utility shall file a completed annual report with the Commission
on or before April 1 of each year. The report shall be in the form specified by the
Commission and in compliance with these rules and all other requirements established
by the Commission. The annual report shall include a report on the construction status
of each service territory covered by the utility’s CCN. The report shall also include an
affirmation and supporting documentation that the financial security required by Rules
1220-04-13-.07 remains in effect.
WASTEWATER REGULATIONS
CHAPTER 1220-04-13
(d)
The name, title, address, telephone number, and email, of the person(s) who should be
contacted in connection with:
1.
General management.
2.
Customer relations and consumer complaints.
3.
Engineering and operations.
4.
Emergencies during non-office hours.
5.
The certified operator for each wastewater system included in the CCN.
(e)
Any correspondence related to a notice of violation or administrative action from a state
or federal regulatory agency or the initiation of litigation. Such correspondence shall be
filed within seven (7) days of the utility’s notice or receipt.
(f)
Any correspondence to and from TDEC related to the wastewater utility’s State
Operating Permit. Such correspondence shall be filed within seven (7) days of the
utility’s notice or receipt.
(g)
The wastewater utility shall notify the Commission within thirty (30) days when an entity
with which it has a contractual relationship in the development, construction or
operation of a wastewater system upon which its CCN is based, in whole or in part,
files for bankruptcy protection or otherwise becomes unable or unwilling to carry out its
contractual obligations with respect to the wastewater system.