Tenn. Code Ann. § 65-10-102

Duration of contractors' lien

Year: 2026Length: 108 words
The lien shall continue in force for six (6) months after the performance of the work or the delivery of the material, and until the termination of any suit commenced within the time for its enforcement. Acts 1883, ch. 220, § 1; Shan., § 3571; Code 1932, § 7993; T.C.A. (orig. ed.), § 65-1002. The lien shall continue in force for six (6) months after the performance of the work or the delivery of the material, and until the termination of any suit commenced within the time for its enforcement. Acts 1883, ch. 220, § 1; Shan., § 3571; Code 1932, § 7993; T.C.A. (orig. ed.), § 65-1002.
Tenn. Code Ann. § 65-10-102: Duration of contractors' lien | Justis AI