Tenn. Code Ann. § 29-14-104
Construction of contract before or after breach
Year: 2026Length: 66 words
A contract may be construed either before or after there has been a breach thereof. Acts 1923, ch. 29, § 3; Shan. Supp., § 4726a3; Code 1932, §8837; T.C.A. (orig. ed.), § 23-1104.
A contract may be construed either before or after there has been a breach thereof.
Acts 1923, ch. 29, § 3; Shan. Supp., § 4726a3; Code 1932, §8837; T.C.A. (orig. ed.), § 23-1104.