Utah ยท Regulations
R655-11 โ Requirements for the Design, Construction and Abandonment of Dams
44 sections
44 sections
- R655-11-1R655-11-1. Authority and Applicability
- R655-11-2R655-11-2. Purpose and Scope
- R655-11-3R655-11-3. Definitions
- R655-11-4R655-11-4. Hydrologic Design
- R655-11-4AR655-11-4A. Inflow Design Hydrograph Determination
- R655-11-4BR655-11-4B. Freeboard Requirements
- R655-11-4CR655-11-4C. Spillways
- R655-11-4DR655-11-4D. Infiltration Rates
- R655-11-4ER655-11-4E. Flood Routing
- R655-11-4FR655-11-4F. Incremental Damage Assessment for High and Moderate Hazard Dams
- R655-11-4GR655-11-4G. Historical Records
- R655-11-5R655-11-5. Seismic Design
- R655-11-5AR655-11-5A. Geological and Seismic Study
- R655-11-5BR655-11-5B. Determination of Dam and Foundation Material Properties
- R655-11-5CR655-11-5C. Method of Analysis
- R655-11-5DR655-11-5D. Design Measures
- R655-11-5ER655-11-5E. Appurtenant Structures
- R655-11-6R655-11-6. Embankment Requirements
- R655-11-6AR655-11-6A. Factors of Safety
- R655-11-6BR655-11-6B. Dam Crest Requirements
- R655-11-6CR655-11-6C. External Erosion Control
- R655-11-6DR655-11-6D. Internal Erosion Control
- R655-11-6ER655-11-6E. Internal Drainage
- R655-11-7R655-11-7. Outlet Requirements
- R655-11-7AR655-11-7A. Outlet Sizing
- R655-11-7BR655-11-7B. Outlet Materials
- R655-11-7CR655-11-7C. Outlet Details
- R655-11-8R655-11-8. Spillway Requirements
- R655-11-9R655-11-9. Other Design Requirements
- R655-11-10R655-11-10. Instrumentation
- R655-11-10AR655-11-10A. Reservoir Staff Gages
- R655-11-10BR655-11-10B. Survey Markers and Bench Marks
- R655-11-10CR655-11-10C. Piezometers
- R655-11-10DR655-11-10D. Seepage Measurements
- R655-11-10ER655-11-10E. Strong Motion Instruments
- R655-11-11R655-11-11. Abandonment of Dams
- R655-11-11AR655-11-11A. Removal of Dam
- R655-11-11BR655-11-11B. Breaching of Dam
- R655-11-12R655-11-12. Construction
- R655-11-12AR655-11-12A. Informal Construction Inspections
- R655-11-12BR655-11-12B. Formal Construction Inspections
- R655-11-12CR655-11-12C. Construction Reporting Requirements
- R655-11-12DR655-11-12D. Change Order Approvals
- R655-11-12ER655-11-12E. Final Inspection