R652-21-403

R652-21-403. Secondary Recovery Royalty Agreement

Last amended: 2024Length: 175 wordsOfficial source

Cite as Utah Admin. Code R652-21-403

(1) Before any sale occurs, an Operator shall provide a Self-Certification and report the quantity, in existence before the effective date of Rule R652-21, of Secondary Material for which they intend to utilize Secondary Recovery Processes. (2) A Feasibility Assessment is not required for a Secondary Recovery Royalty Agreement, so long as any Operational Waste, by-products, or discharges associated with the processing are not released onto sovereign lands or other hydrologically connected resources. (3) An Operator shall enter into a Feasibility Assessment before continuing to extract or process, under a royalty agreement other than a Secondary Recovery Royalty Agreement, a Great Salt Lake Element or Mineral from any tailings, discarded material, end-use products, or waste products beyond those reported in Subsection R652-21-403(1). (4) A Secondary Recovery Royalty Agreement shall terminate when the last Secondary Material, as reported in Subsection R652-21-403(1), is processed and sold. (5) Any Great Salt Lake Element or Mineral extracted or evaporated after the effective date of Rule R652-21 is not eligible for processing and sale under a Secondary Recovery Royalty Agreement.
R652-21-403: R652-21-403. Secondary Recovery Royalty Agreement | Justis AI