R653-10-2
R653-10-2. Definitions
Cite as Utah Admin. Code R653-10-2
(1) As used in this section:
(a) "Applicant" means a secondary water supplier
.
(b)
"Board"
means
the
Board
of
Water
Resources.
(c)
"Division"
means
the
Division
of
Water
Resources.
(d) "Project" means the purchase and installation of a meter for a secondary water system that, as of the effective date of this rule, provides secondary water service that is not metered.
(e) "Secondary water" means the same as that term is defined in Section 73-10-34.
(f) "Secondary water connection" means the location where the water leaves the secondary water supplier's mainline and enters the water user's line.
(g) "Secondary water supplier" means the same as that term is defined in Section 73-10-34.
R653-10-3.
Grants
for
Secondary
Water
Meters.
(1)(a)
The
board
may
issue
a
grant
to
an
applicant
to
fund
a
project
for
the
purchase
and
installation
of
meters
on
an
existing
secondary
water
system
that
provides
secondary
water
service
that
is
not
metered.
(b)
The
board
may
not
issue
a
grant
under
this
section
to
fund:
(i)
metering
of
secondary
water
for
service
that
begins
on
or
after
the
effective
date
of
this
rule;
or
(ii)
the
replacement
or
repair
of
an
existing
secondary
water
meter.
(2)(a)
A
secondary
water
supplier
with
7,000
secondary
water
connections
or
fewer
may
receive
no
more
than
$5,000,000
in
grant
funds.
(b)
A
secondary
water
supplier
with
more
than
7,000
secondary
water
connections
may
receive
no
more
than
$10,000,000
in
grant
funds.
(c)(i)
Subject
to
the
other
provisions
of
this
rule,
a
grant
may
not
exceed
the
following
amounts for the costs associated with a project, including installation or purchase of meters:
(A)
for
contracts
completed
with
the
board
calendar
year
2022,
70%
of
the
costs
of
a
project;
(B)
for
contracts
completed
with
the
board
calendar
year
2023,
70%
of
the
costs
of
a
project;
and
(C)
for
contracts
completed
with
the
board
calendar
year
2024,
65%
of
the
costs
of
a
project.
(d)
A
secondary
water
supplier
may
pay
up
to
85%
of
its
share
of
project
costs
under
Subsection
(c)
through
a
1%
interest
loan
from
the
board.
(3)
Projects
receiving
project
grant
funds
under
this
rule
must:
(a)
commit
all
grant
funds
through
contract
no
later
than
December
31,
2024;
and
(b)
spend
all
grant
funds
and
complete
construction
of
the
project
no
later
than
December
31,
2026.
R653-10-4.
Applications
for
Grants.
(1)(a)
To
obtain
a
grant
under
this
rule,
an
applicant
shall
submit
an
application
with
the
division.
(b)
If
grant
funding
described
in
Subsection
R653-10-1(1)
remains
after
the
first
round
of
applications
and
grant
disbursements,
the
board
may
designate
one
or
more
additional
application
periods
to
ensure
the
entire
funding
amount
is
awarded
by
December
31,
2024.
(2)
An
application
submitted
to
the
division
shall
include:
(a)
a
detailed
project
cost
estimate,
including
engineering
fees,
meter
costs,
and
installation
costs;
(b)
the
total
number
of
pressurized
secondary
water
connections
in
the
applicant's
secondary
water system;
(c) the number of meters to be installed under the grant;
(d) detailed estimated secondary water use information, including:
(i)
average
lot
size;
(ii) average irrigated acreage; and
(iii) estimated secondary water usage before the project versus after completion of the project;
(e) the timeline for purchase and installation of meters under the project, including the projected start date and expected completion date;
(f) estimated need for additional water and timeline for anticipated shortages;
(g) project plans and specifications---stamped and signed by the Utah licensed professional engineer responsible for the project;
(h)
an
agreement
to:
(i)(A)
provide
an
educational
component
promoting
water
conservation
on
a
monthly
water
use
statement
provided
to
the
applicant's
secondary
water
customers;
or
(B)
bill
according
to
usage
based
on
a
tiered
conservation
rate;
or
(C)
provide
both
an
educational
component
on
water
conservation
and
bill
based
on
a
tiered
conservation
rate;
and
(ii)(A)
commit
project
grant
funds
through
contract
no
later
than
December
31,
2024;
and
(B)
spend
all
project
grant
funds
and
complete
construction
of
the
project
no
later
than
December
31,
2026;
(i)
applicant's
verification
that
the
information
provided
in
the
application
is
accurate
and
any
estimates
or
projections
submitted
are
based
on
sound
professional
judgement
and
the
best
available
data;
and
(j)
additional
information
required
on
the
application.
R653-10-5.
Application
Review
and
Prioritization.
(1)
The
division
shall:
(a)
review
and
prioritize
an
application
submitted
under
Section
R653-10-4;
and
(b)
recommend
to
the
board
which
applicants
should
be
awarded
a
grant
under
this
rule.
(2)
In
reviewing
and
prioritizing
applications
submitted
under
Subsection
(1),
the
division:
(a)
may
contact
an
applicant
to:
(i)
verify
information
in
the
application;
(ii)
seek
clarifications
and
supplemental
information;
and
(iii)
address
and
correct
anomalies
and
inconsistencies
in
the
application;
and
(b)
shall
score
the
applications
based
on
the
following:
(i)
Return
on
Investment---projects that provide the greatest level of water conservation from funds contributed by the state.
(A) The metric for measuring Return on Investment is the ratio of estimated annual water use savings resulting from the project divided by the total state contribution to the project, including grants, loans, and other forms of financial assistance provided by the state.
(ii) Need---applicants facing imminent secondary water shortages where the project will delay or eliminate the need for new water development.
(A) The metric for measuring Need is the imminency of secondary water shortage and the period of time the project will delay the shortage and the need for new water development.
(iii) Shovel Readiness---projects with accelerated construction schedules.
(A) The metric for measuring Shovel Readiness is the project's start date, and
time to completion divided by the number of meters installed.
(3) Each scoring category in Subsection (2) will be weighted as follows:
(a)
Return
on
Investment---60%
weight;
(b) Need---20% weight; and
(c) Shovel Readiness---20% weight.
(4)(a) The division will prioritize each application based on the scoring criteria in Subsection (2) and weighting requirements in Subsection (3).
(b) The prioritization will form the basis for the division's recommendation to the board on applicants that should be awarded a grant.