R907-63-4. Additional Procedures for Damaged Structure

Last amended: 2025Length: 83 wordsOfficial source

Cite as Utah Admin. Code R907-63-4

When damage occurs to a bridge structure, the UDOT Structures Division shall: (1) track the costs for preparing design calculations, design plans, specifications, and engineering estimates, including professional engineering services and construction engineering with associated overhead costs, along with the costs related to publication, preparation, and advertising the bid package; and (2) award the project to the lowest responsive and responsible bidder; and (3) submit the final project costs, including eligible department charges, to UDOT Division of Finance for the cost recovery process.