R315-319-1

R315-319-1. Permit Required

Last amended: 2026Length: 223 wordsOfficial source

Cite as Utah Admin. Code R315-319-1

(a) Landfills disposing of coal combustion residuals and surface impoundments containing coal combustion residuals shall have a permit for a Class I, II, or V landfill or a coal combustion residuals permit issued under Rule R315-319. (b) An application for a permit for a coal combustion residual landfill or surface impoundment or multiple landfills and impoundments at a facility covered by one permit shall be made to the director. (c)(1) An application for a permit for a Coal Combustion Residue (CCR) unit shall contain the information required in Sections R315-319-60 through R315-319-107. No information needs be submitted for which the effective date in Sections R315-319-60 through R315-319-107 has not been reached when the application is submitted. (2) Information required in Sections R315-319-60 through R315-319-107 with an effective date that falls later that the application submittal required in Subsection R315-319-1(c)(1) shall be submitted within six months of the effective date of the requirement found in Sections R315-319-60 through R315-319-107. (d) Permit application procedures shall follow the requirements of Sections R315-310-1 and R315-310-2. (e) Permit transfers shall follow the procedures of Section R315-310-11. (f) Permit applicants shall follow the notification requirements of Subsection R315-310-3(2). (g) Permit approvals shall follow the requirements of Rule R315-311. (h) The director approvals required in Sections R315-319-60 through R315-319-107 are satisfied by the issuance of a permit by the director.
R315-319-1: R315-319-1. Permit Required | Justis AI