9VAC20-90-120

9VAC20-90-120. Permit application fee schedules

Last amended: 2023Year: 2026Length: 768 wordsOfficial source

Cite as 9 Va. Admin. Code § 20-90-120

TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION. TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION. TYPE OF FACILITY FEE TYPE OF FACILITY FEE All landfills: All landfills: Part A application $4,180 Part A application $4,180 Part B application $18,680 Part B application $18,680 Incineration/Energy Recovery Facility $5,880 Incineration/Energy Recovery Facility $5,880 Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility $4,310 Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility $4,310 Compost Facility Compost Facility Facilities Processing Category I Waste $6,850 Facilities Processing Category I Waste $6,850 Facilities Processing Waste Categories I, II, or III, or Categories III and Lower $10,550 Facilities Processing Waste Categories I, II, or III, or Categories III and Lower $10,550 Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower $12,670 Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower $12,670 Experimental Solid Waste Facility $2,090 Experimental Solid Waste Facility $2,090 Permit-by-rule Initial Review and Confirmation $390 Permit-by-rule Initial Review and Confirmation $390 Emergency Permit $2,310 Emergency Permit $2,310 TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS. TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS. TYPE OF PERMIT MODULE FEE TYPE OF PERMIT MODULE FEE Landfill Part A $4,180 Landfill Part A $4,180 General - Module I $390 General - Module I $390 Facility - Module II $1,310 Facility - Module II $1,310 Landfill - Module III, IV, or V $7,050 Landfill - Module III, IV, or V $7,050 Design plan review $910 Design plan review $910 Liner design review $1,960 Liner design review $1,960 Leachate system review $1,310 Leachate system review $1,310 Gas management plan review $1,700 Gas management plan review $1,700 Drainage plan review $910 Drainage plan review $910 Cover design review $1,830 Cover design review $1,830 Equipment $390 Equipment $390 Compost facility - Module VI $3,660 Compost facility - Module VI $3,660 Design plan review $650 Design plan review $650 Liner design review $1,310 Liner design review $1,310 Leachate system review $910 Leachate system review $910 Drainage plan review $650 Drainage plan review $650 Equipment $390 Equipment $390 Transfer station - Module VII $1,180 Transfer station - Module VII $1,180 Material recovery facility - Module VIII $1,570 Material recovery facility - Module VIII $1,570 Waste supply analysis $650 Waste supply analysis $650 Waste management areas $520 Waste management areas $520 Wastewater management areas $390 Wastewater management areas $390 Incinerator/Energy recovery facility - Module IX $3,000 Incinerator/Energy recovery facility - Module IX $3,000 Waste and residue storage $910 Waste and residue storage $910 Operational requirements $1,570 Operational requirements $1,570 Waste control procedures $520 Waste control procedures $520 Groundwater monitoring - Module X or XI $3,260 Groundwater monitoring - Module X or XI $3,260 Well placement $1,310 Well placement $1,310 Materials and specifications $390 Materials and specifications $390 Sampling plan $1,570 Sampling plan $1,570 Closure - Module XII $390 Closure - Module XII $390 Post-closure - Module XIII $390 Post-closure - Module XIII $390 Corrective action - Module XIV $3,000 Corrective action - Module XIV $3,000 Leachate handling Module XV $1,310 Leachate handling Module XV $1,310 Regulated medical waste storage or transfer facility - Module XVI $390 Regulated medical waste storage or transfer facility - Module XVI $390 Regulated medical waste treatment facility - Module XVII $390 Regulated medical waste treatment facility - Module XVII $390 Permit-by-rule Modification Review and Confirmation $390 Permit-by-rule Modification Review and Confirmation $390 Public participation (does not include costs of newspaper advertisements or radio broadcasts) $1,040 Public participation (does not include costs of newspaper advertisements or radio broadcasts) $1,040 TABLE 3.1-3. VARIANCE REQUESTS. TABLE 3.1-3. VARIANCE REQUESTS. TYPE OF VARIANCE FEE TYPE OF VARIANCE FEE Base fee for all variances $390 Base fee for all variances $390 Supplemental fees based on variance type Supplemental fees based on variance type Exemption from classification as a solid waste $520 Exemption from classification as a solid waste $520 Variance to permitting requirements Variance to permitting requirements Siting requirements $520 Siting requirements $520 Facility design (other than alternate liner design) $520 Facility design (other than alternate liner design) $520 Operational requirements -- Operational requirements -- Groundwater monitoring (other than groundwater protection standards and location of monitoring system) $920 Groundwater monitoring (other than groundwater protection standards and location of monitoring system) $920 Closure requirements -- Closure requirements -- Post-closure requirements -- Post-closure requirements -- Groundwater Protection Standards -- Groundwater Protection Standards -- Alternate liner system design $1,570 Alternate liner system design $1,570 Location of groundwater monitoring system $920 Location of groundwater monitoring system $920
9VAC20-90-120: 9VAC20-90-120. Permit application fee schedules | Justis AI