9VAC20-90-120
9VAC20-90-120. Permit application fee schedules
Cite as 9 Va. Admin. Code § 20-90-120
TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.
TABLE 3.1–1. NEW OR INITIAL ISSUANCE OR ACTION.
TYPE OF FACILITY FEE
TYPE OF FACILITY
FEE
All landfills:
All landfills:
Part A application $4,180
Part A application
$4,180
Part B application $18,680
Part B application
$18,680
Incineration/Energy Recovery Facility $5,880
Incineration/Energy Recovery Facility
$5,880
Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility $4,310
Transfer Station, Materials Recovery Facility, Regulated Medical Waste Storage or Transfer Facility, or Regulated Medical Waste Treatment Facility
$4,310
Compost Facility
Compost Facility
Facilities Processing Category I Waste $6,850
Facilities Processing Category I Waste
$6,850
Facilities Processing Waste Categories I, II, or III, or Categories III and Lower $10,550
Facilities Processing Waste Categories I, II, or III, or Categories III and Lower
$10,550
Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower $12,670
Facilities Processing Waste Categories I, II, III, or IV, or Categories IV and Lower
$12,670
Experimental Solid Waste Facility $2,090
Experimental Solid Waste Facility
$2,090
Permit-by-rule Initial Review and Confirmation $390
Permit-by-rule Initial Review and Confirmation
$390
Emergency Permit $2,310
Emergency Permit
$2,310
TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.
TABLE 3.1-2. MAJOR PERMIT ACTIONS, AMENDMENTS, OR MODIFICATIONS.
TYPE OF PERMIT MODULE FEE
TYPE OF PERMIT MODULE
FEE
Landfill Part A $4,180
Landfill Part A
$4,180
General - Module I $390
General - Module I
$390
Facility - Module II $1,310
Facility - Module II
$1,310
Landfill - Module III, IV, or V $7,050
Landfill - Module III, IV, or V
$7,050
Design plan review $910
Design plan review
$910
Liner design review $1,960
Liner design review
$1,960
Leachate system review $1,310
Leachate system review
$1,310
Gas management plan review $1,700
Gas management plan review
$1,700
Drainage plan review $910
Drainage plan review
$910
Cover design review $1,830
Cover design review
$1,830
Equipment $390
Equipment
$390
Compost facility - Module VI $3,660
Compost facility - Module VI
$3,660
Design plan review $650
Design plan review
$650
Liner design review $1,310
Liner design review
$1,310
Leachate system review $910
Leachate system review
$910
Drainage plan review $650
Drainage plan review
$650
Equipment $390
Equipment
$390
Transfer station - Module VII $1,180
Transfer station - Module VII
$1,180
Material recovery facility - Module VIII $1,570
Material recovery facility - Module VIII
$1,570
Waste supply analysis $650
Waste supply analysis
$650
Waste management areas $520
Waste management areas
$520
Wastewater management areas $390
Wastewater management areas
$390
Incinerator/Energy recovery facility - Module IX $3,000
Incinerator/Energy recovery facility - Module IX
$3,000
Waste and residue storage $910
Waste and residue storage
$910
Operational requirements $1,570
Operational requirements
$1,570
Waste control procedures $520
Waste control procedures
$520
Groundwater monitoring - Module X or XI $3,260
Groundwater monitoring - Module X or XI
$3,260
Well placement $1,310
Well placement
$1,310
Materials and specifications $390
Materials and specifications
$390
Sampling plan $1,570
Sampling plan
$1,570
Closure - Module XII $390
Closure - Module XII
$390
Post-closure - Module XIII $390
Post-closure - Module XIII
$390
Corrective action - Module XIV $3,000
Corrective action - Module XIV
$3,000
Leachate handling Module XV $1,310
Leachate handling Module XV
$1,310
Regulated medical waste storage or transfer facility - Module XVI $390
Regulated medical waste storage or transfer facility - Module XVI
$390
Regulated medical waste treatment facility - Module XVII $390
Regulated medical waste treatment facility - Module XVII
$390
Permit-by-rule Modification Review and Confirmation $390
Permit-by-rule Modification Review and Confirmation
$390
Public participation (does not include costs of newspaper advertisements or radio broadcasts) $1,040
Public participation (does not include costs of newspaper advertisements or radio broadcasts)
$1,040
TABLE 3.1-3. VARIANCE REQUESTS.
TABLE 3.1-3. VARIANCE REQUESTS.
TYPE OF VARIANCE FEE
TYPE OF VARIANCE
FEE
Base fee for all variances $390
Base fee for all variances
$390
Supplemental fees based on variance type
Supplemental fees based on variance type
Exemption from classification as a solid waste $520
Exemption from classification as a solid waste
$520
Variance to permitting requirements
Variance to permitting requirements
Siting requirements $520
Siting requirements
$520
Facility design (other than alternate liner design) $520
Facility design (other than alternate liner design)
$520
Operational requirements --
Operational requirements
--
Groundwater monitoring (other than groundwater protection standards and location of monitoring system) $920
Groundwater monitoring (other than groundwater protection standards and location of monitoring system)
$920
Closure requirements --
Closure requirements
--
Post-closure requirements --
Post-closure requirements
--
Groundwater Protection Standards --
Groundwater Protection Standards
--
Alternate liner system design $1,570
Alternate liner system design
$1,570
Location of groundwater monitoring system $920
Location of groundwater monitoring system
$920