9VAC25-31-570

9VAC25-31-570. Frequency of monitoring

Last amended: 2022Year: 2026Length: 371 wordsOfficial source

Cite as 9 Va. Admin. Code § 25-31-570

A. Biosolids. 1. The frequency of monitoring for the pollutants listed in Tables 1 through 4 of 9VAC25-31-540 ; the pathogen density requirements in 9VAC25-31-710 A and B 2 through B 4; and the vector attraction reduction requirements in 9VAC25-31-720 B 1 through B 4, B 7 and B 8 shall be the frequency in Table 1 of this section. TABLE 1 FREQUENCY OF MONITORING--LAND APPLICATION TABLE 1 FREQUENCY OF MONITORING--LAND APPLICATION Amount of biosolids* (metric tons per 365-day period) Frequency Amount of biosolids* (metric tons per 365-day period) Frequency Greater than zero but less than 290 once per year Greater than zero but less than 290 once per year Equal to or greater than 290 but less than 1,500 once per quarter (four times a year) Equal to or greater than 290 but less than 1,500 once per quarter (four times a year) Equal to or greater than 1,500 but less than 15,000 once per 60 days (six times per year) Equal to or greater than 1,500 but less than 15,000 once per 60 days (six times per year) Equal to or greater than 15,000 once per month (12 times per year) Equal to or greater than 15,000 once per month (12 times per year) *Either the amount of bulk biosolids applied to the land or the amount of biosolids prepared for sale or give-away in a bag or other container for application to the land (dry weight basis). *Either the amount of bulk biosolids applied to the land or the amount of biosolids prepared for sale or give-away in a bag or other container for application to the land (dry weight basis). 2. After the biosolids has been monitored for two years at the frequency in Table 1 of this section, the department may reduce the frequency of monitoring for pollutant concentrations and for the pathogen density requirements in 9VAC25-31-710 A 5 b and c. B. Domestic septage. If either the pathogen requirements in 9VAC25-31-710 C 2 or the vector attraction reduction requirements in 9VAC25-31-720 B 12 are met when domestic septage is applied to agricultural land, forest, or a reclamation site, each container of domestic septage applied to the land shall be monitored for compliance with those requirements.
9VAC25-31-570: 9VAC25-31-570. Frequency of monitoring | Justis AI