9VAC25-880-10

9VAC25-880-10. Purpose

Last amended: 2024Year: 2026Length: 75 wordsOfficial source

Cite as 9 Va. Admin. Code § 25-880-10

This general permit regulation governs stormwater discharges from regulated construction activity, which includes large construction activity, small construction activity, or construction support activity, through a point source to surface waters or through a municipal or nonmunicipal separate storm sewer system to surface waters. Stormwater discharges associated with regulated industrial activity that originate from a construction site that has been completed and where the site has undergone final stabilization are not authorized by this general permit.
9VAC25-880-10: 9VAC25-880-10. Purpose | Justis AI