Washington · Regulations
Chapter 222-30 — TIMBER HARVESTING
20 sections
20 sections
- WAC 222-30-010WAC 222-30-010. Policy—Timber harvesting
- WAC 222-30-020WAC 222-30-020. *Harvest unit planning and design
- WAC 222-30-021WAC 222-30-021. *Western Washington riparian management zones
- WAC 222-30-022WAC 222-30-022. *Eastern Washington riparian management zones
- WAC 222-30-023WAC 222-30-023. Riparian management zones for exempt 20-acre parcels
- WAC 222-30-025WAC 222-30-025. Even-aged harvest—Size and timing
- WAC 222-30-030WAC 222-30-030. Stream bank integrity
- WAC 222-30-040WAC 222-30-040. Shade requirements to maintain water temperature
- WAC 222-30-045WAC 222-30-045. Salvage logging within riparian management zones
- WAC 222-30-050WAC 222-30-050. Felling and bucking
- WAC 222-30-060WAC 222-30-060. Cable yarding
- WAC 222-30-062WAC 222-30-062. *Large woody debris removal or repositioning
- WAC 222-30-065WAC 222-30-065. Helicopter yarding
- WAC 222-30-070WAC 222-30-070. Ground-based logging systems
- WAC 222-30-080WAC 222-30-080. Landing cleanup
- WAC 222-30-090WAC 222-30-090. Postharvest site preparation
- WAC 222-30-100WAC 222-30-100. Slash disposal or prescribed burning
- WAC 222-30-110WAC 222-30-110. Timber harvesting on islands
- WAC 222-30-120WAC 222-30-120. Rate of harvest monitoring
- WAC 222-30-0211WAC 222-30-0211. Western Washington Type Np Water riparian management zones and Type Ns Water riparian protections