Washington · Regulations
Chapter 480-108 — ELECTRIC COMPANIES — INTERCONNECTION WITH ELECTRIC GENERATORS
13 sections
13 sections
- WAC 480-108-001WAC 480-108-001. Purpose and scope
- WAC 480-108-005WAC 480-108-005. Application of rules
- WAC 480-108-010WAC 480-108-010. Definitions
- WAC 480-108-015WAC 480-108-015. Scope of Part 1
- WAC 480-108-020WAC 480-108-020. Eligibility and technical requirements for Tier 1, Tier 2, and Tier 3 interconnection
- WAC 480-108-030WAC 480-108-030. Application for interconnection
- WAC 480-108-040WAC 480-108-040. General terms and conditions of interconnection
- WAC 480-108-050WAC 480-108-050. Completion of interconnection process
- WAC 480-108-080WAC 480-108-080. Interconnection service tariffs
- WAC 480-108-100WAC 480-108-100. Dispute resolution
- WAC 480-108-110WAC 480-108-110. Required filings—Exceptions
- WAC 480-108-120WAC 480-108-120. Cumulative effects of interconnections
- WAC 480-108-999WAC 480-108-999. Adoption by reference