WAC 173-549-020
WAC 173-549-020. Establishment of minimum instream flows
(1) Minimum instream flows are established for stream management units with monitoring to take place at certain control points as follows:
Stream Management Unit Information
Stream Management Unit Name, Control Station Name and Number Control Station Location by River Mile, Section, Township, Range Affected Stream Reach Lower Okanogan Okanogan R. at Malott (12447200) 17.0, 9-32-25E Okanogan River confluence with Wells Pool to confluence of Chewiliken Cr. Middle Okanogan Okanogan R. nr. Tonasket (12445000) 50.8, 8-36-27E Okanogan River confluence of Chewiliken Creek to confluence Similkameen River Upper Okanogan Okanogan R. at Oroville (12439500) 77.3, 27-40-27E Okanogan River confluence of Similkameen River to Osoyoos Lake Similkameen Similkameen R. at Nighthawk (12442500) 15.8, 7-40-26E Similkameen River confluence with Okanogan River to Canadian Border
Stream Management
Unit Name, Control
Station Name and
Number
Control Station
Location by River
Mile, Section,
Township, Range
Affected Stream
Reach
Lower Okanogan
Okanogan R.
at Malott
(12447200)
17.0,
9-32-25E
Okanogan River
confluence with
Wells Pool to confluence of Chewiliken Cr.
Middle Okanogan
Okanogan R.
nr. Tonasket
(12445000)
50.8,
8-36-27E
Okanogan River confluence of Chewiliken Creek to confluence Similkameen River
Upper Okanogan
Okanogan R.
at Oroville
(12439500)
77.3,
27-40-27E
Okanogan River confluence of Similkameen River to Osoyoos Lake
Similkameen
Similkameen R.
at Nighthawk
(12442500)
15.8,
7-40-26E
Similkameen River confluence with Okanogan River to Canadian Border
(2) Minimum instream flows established for the stream management units in WAC 173-549-020(1) are as follows:
Minimum Instream Flows in the
Okanogan River
(All Figures in Cubic Feet Per Second)
Month Day Lower Okanogan 12447200 Middle Okanogan 1244500 Upper Okanogan 124426000 Similkameen 12439500 Jan. 1 860 800 320 400 15 830 800 320 400 Feb. 1 820 800 320 400 15 850 800 320 400 Mar. 1 880 800 320 425 15 900 800 320 450 Apr. 1 925 910 330 510 15 1,100 1,070 340 640 May 1 1,750 1,200 350 1,100 15 3,800 3,800 500 3,400 Jun. 1 3,800 3,800 500 3,400 15 3,800 3,800 500 3,400 Jul. 1 2,100 2,150 420 1,900 15 1,200 1,200 350 1,070 Aug. 1 800 840 320 690 15 600 600 300 440 Sept. 1 620 600 300 400 15 700 600 300 400 Oct. 1 750 730 330 450 15 960 900 370 500 Nov. 1 950 900 370 500 15 950 900 320 500 Dec. 1 930 900 320 500 15 900 850 320 450
Month
Day
Lower
Okanogan
12447200
Middle
Okanogan
1244500
Upper
Okanogan
124426000
Similkameen
12439500
Jan.
1
860
800
320
400
15
830
800
320
400
Feb.
1
820
800
320
400
15
850
800
320
400
Mar.
1
880
800
320
425
15
900
800
320
450
Apr.
1
925
910
330
510
15
1,100
1,070
340
640
May
1
1,750
1,200
350
1,100
15
3,800
3,800
500
3,400
Jun.
1
3,800
3,800
500
3,400
15
3,800
3,800
500
3,400
Jul.
1
2,100
2,150
420
1,900
15
1,200
1,200
350
1,070
Aug.
1
800
840
320
690
15
600
600
300
440
Sept.
1
620
600
300
400
15
700
600
300
400
Oct.
1
750
730
330
450
15
960
900
370
500
Nov.
1
950
900
370
500
15
950
900
320
500
Dec.
1
930
900
320
500
15
900
850
320
450
(3) Minimum instream flow hydrographs, as represented in WAC 173-549-900 , shall be used for definition of minimum instream flows on those days not specifically identified in WAC 173-549-020(2).
(4) Future consumptive water right permits hereafter issued for diversion of surface water from the mainstem Okanogan River and the Similkameen River shall be expressly subject to minimum instream flows established in WAC 173-549-020 (1) through (3) except those described in WAC 173-549-070 .
(5) Projects that would reduce the flow in a portion of a stream's length (e.g. hydroelectric projects that bypass a portion of a stream) will be considered consumptive only with respect to the affected portion of the stream. Such projects will be subject to instream flows as specified by the department. These flows may be those established in WAC 173-549-020 or, when appropriate, may be flows specifically tailored to that particular project and stream reach. When studies are required to determine such reach- and project-specific flow requirements, the department may require the project proponent to conduct such studies.