WAC 197-11-050
WAC 197-11-050. Lead agency
(1) A lead agency shall be designated when an agency is developing or is presented with a proposal, following the rules beginning at WAC 197-11-922 .
(2) The lead agency shall be the agency with main responsibility for complying with SEPA's procedural requirements and shall be the only agency responsible for:
(a) The threshold determination; and
(b) Preparation and content of environmental impact statements.