WAC 246-272A-0265. Record drawings

Last amended: 2025Year: 2026Length: 188 wordsOfficial source
Upon completion of new construction, alteration, or repair of the OSS, the OSS owner shall submit a complete and detailed record drawing to the local health officer that includes at a minimum: (1) Measurements and directions accurate to +/- 1/2 foot, unless otherwise determined by the local health officer, so that the following parts of the OSS can be easily located: (a) All sewage tank openings requiring access; (b) The ends, and all changes in direction, of installed and found buried pipes and electrical cables that are part of the OSS; and (c) Any other OSS component which, in the judgment of the local health officer or the designer, must be accessed for observation, maintenance, or operation; (2) Location and dimensions of the reserve area; (3) Record that materials and equipment meet the specifications contained in the design; (4) Initial settings of electrical or mechanical devices that must be known to operate the system in the manner intended by the designer or installer; and (5) For proprietary products, manufacturer's standard product literature, including performance specifications and maintenance recommendations needed for operation, monitoring, maintenance, or repair of the OSS.
WAC 246-272A-0265: WAC 246-272A-0265. Record drawings | Justis AI