WAC 246-272B-02400

WAC 246-272B-02400. LOSS constructed on or before July 1, 1984

Last amended: 2011Year: 2026Length: 257 wordsOfficial source
(1) The owner of a LOSS constructed on or before July 1, 1984, who does not have an operating permit issued by the department shall submit: (a) A completed application on a form provided by the department; (b) Copies of all available design and construction documentation, including previous design and construction reviews of the LOSS by the department of ecology or local health jurisdiction; (c) A copy of any permit previously issued by the department of ecology or a local health jurisdiction; and (d) The annual operating permit fee established in chapter 246-272 WAC, Wastewater and reclaimed water use fees. (2) The department shall review the application and all other documents submitted and may issue an operating permit unless there is a current known failure. The operating permit may have conditions including, but not limited to, the following owner requirements: (a) Submit inspection results prepared, stamped, signed, and dated by a design engineer that identify and map the basic treatment elements of the LOSS; (b) Submit an SRS; (c) Submit an engineering evaluation prepared, stamped, signed, and dated by a design engineer to verify that the LOSS is operating properly to treat sewage, and protect public health and the environment; (d) Submit an O&M manual; or (e) Prohibit additional connections to the LOSS until the owner demonstrates that the LOSS treatment process, drainfield, and reserve area meet requirements specified in WAC 246-272B-06050 , 246-272B-06100 , and 246-272B-06250 through 246-272B-06500 . (3) If the LOSS is failing, the owner shall comply with the requirements in WAC 246-272B-07450 .
WAC 246-272B-02400: WAC 246-272B-02400. LOSS constructed on or before July 1, 1984 | Justis AI