WAC 246-282-070

WAC 246-282-070. Construction and maintenance

Last amended: 2026Year: 2026Length: 162 wordsOfficial source
(1) An owner or person in charge of shellfish operations shall arrange their physical facilities to aid in the flow of shellfish products through all handling, processing, and storage areas in a manner that will minimize contamination of the shellfish. (2) An owner of a shellfish operation shall submit to the department for consultation properly prepared plans and specifications of physical facilities for shellfish processing or sanitation activities at least 30 days before the facilities are: (a) Originally constructed; (b) Converted from another use; or (c) Extensively remodeled to the extent that a plan for a building permit is required by the city or county where located. (3) The department shall review properly prepared plans and specifications of physical facilities for shellfish processing or sanitation activities required by subsection (2) of this section within 30 days of receipt and provide technical assistance to the owner of the shellfish operation regarding whether the proposed physical facilities would meet the requirements of this chapter.
WAC 246-282-070: WAC 246-282-070. Construction and maintenance | Justis AI