WAC 246-290-634

WAC 246-290-634. Follow-up to treatment technique violations

Last amended: 2010Year: 2026Length: 129 wordsOfficial source
When a treatment technique violation occurs, the purveyor: (1) Shall report to the department in accordance with: (a) WAC 246-290-666 for purveyors providing filtration or required to filter; (b) WAC 246-290-674 for purveyors installing filtration; or (c) WAC 246-290-696 for purveyors meeting the criteria to remain unfiltered or providing a limited alternative to filtration; (2) Shall notify the public in accordance with Part 7, Subpart A of this chapter; (3) Shall determine the cause of the violation; (4) Shall take action as directed by the department which may include conducting a CCP. A CCP may include both a CPE and CTA; (5) Shall identify and systematically address plant-specific factors identified in the CPE during the CTA, if required; and (6) May be subject to enforcement under WAC 246-290-050 .
WAC 246-290-634: WAC 246-290-634. Follow-up to treatment technique violations | Justis AI