WAC 246-292-020

WAC 246-292-020. Public water system requirements

Last amended: 2014Year: 2026Length: 127 wordsOfficial source
(1) A purveyor shall designate at least one certified operator in responsible charge to meet the requirements of WAC 246-292-032 and as required in WAC 246-292-050 (1), (2), and (4), as applicable. (2) A purveyor may designate additional certified operators in responsible charge in accordance with WAC 246-292-050 (3) when a purveyor has designated operating shifts and major segments. (3) A purveyor shall designate and report mandatory certified operators in responsible charge positions to the department within thirty days of: (a) Starting operations of a public water system; or (b) When a mandatory certified operator in responsible charge position is vacated. (4) The purveyor shall not require certified operators to perform an action or correction that is inconsistent with their experience, skills, abilities, or level of certification.
WAC 246-292-020: WAC 246-292-020. Public water system requirements | Justis AI