WAC 246-314-990
WAC 246-314-990. Construction review fees
(1) Upon prior approval by the program the project sponsor may exclude from the "project cost" the cost for fixed or installed technologically advanced clinical equipment such as but not limited to: Lithotripters, CT scans, linear accelerators, and MRIs.
(2) Project fee table. Except as provided in subsection (4) and (5) of this section, the following fees will be charged for project review based on the cost of the project:
project fee table
Project Cost Project Review Fee $ 0 to $ 999 $ 150 1,000 to 1,999 305 2,000 to 2,999 400 3,000 to 4,999 500 5,000 to 9,999 650 10,000 to 19,999 815 20,000 to 29,999 1,000 30,000 to 39,999 1,190 40,000 to 49,999 1,375 50,000 to 64,999 1,620 65,000 to 79,999 1,875 80,000 to 99,999 2,250 100,000 to 124,999 2,690 125,000 to 149,999 3,120 150,000 to 199,999 3,625 200,000 to 249,999 4,060 250,000 to 324,999 4,455 325,000 to 449,999 5,000 450,000 to 574,999 5,615 575,000 to 699,999 6,350 700,000 to 849,999 7,110 850,000 to 999,999 7,995 1,000,000 to 1,249,999 8,725 1,250,000 to 2,499,999 9,560 2,500,000 to 2,999,999 10,430 3,000,000 to 3,499,999 11,350 3,500,000 to 4,999,999 13,115 5,000,000 to 6,999,999 14,885 7,000,000 to 9,999,999 16,840 10,000,000 to 14,999,999 19,340 15,000,000 to 19,999,999 21,780 20,000,000 to 29,999,999 24,280 30,000,000 to 39,999,999 28,060 40,000,000 to 59,999,999 31,235 60,000,000 and over 31,235 plus 0.05% per dollar above 60 million
Project Cost
Project Review Fee
$
0
to
$
999
$
150
1,000
to
1,999
305
2,000
to
2,999
400
3,000
to
4,999
500
5,000
to
9,999
650
10,000
to
19,999
815
20,000
to
29,999
1,000
30,000
to
39,999
1,190
40,000
to
49,999
1,375
50,000
to
64,999
1,620
65,000
to
79,999
1,875
80,000
to
99,999
2,250
100,000
to
124,999
2,690
125,000
to
149,999
3,120
150,000
to
199,999
3,625
200,000
to
249,999
4,060
250,000
to
324,999
4,455
325,000
to
449,999
5,000
450,000
to
574,999
5,615
575,000
to
699,999
6,350
700,000
to
849,999
7,110
850,000
to
999,999
7,995
1,000,000
to
1,249,999
8,725
1,250,000
to
2,499,999
9,560
2,500,000
to
2,999,999
10,430
3,000,000
to
3,499,999
11,350
3,500,000
to
4,999,999
13,115
5,000,000
to
6,999,999
14,885
7,000,000
to
9,999,999
16,840
10,000,000
to
14,999,999
19,340
15,000,000
to
19,999,999
21,780
20,000,000
to
29,999,999
24,280
30,000,000
to
39,999,999
28,060
40,000,000
to
59,999,999
31,235
60,000,000
and over
31,235 plus 0.05% per
dollar above 60 million
(3) Existing building conversions. Building conversion fees will be based on the value of existing construction. Fees will be charged for project review based on the project fee table in subsection (2) of this section.
(a) The existing construction value is based on the local area cost data.
(b) Current cost data is available and posted on the construction review services website: http://www.doh.wa.gov/crs .
(c) Project sponsors may submit specific cost data that accurately describes the estimate good faith value for the program's consideration.
(4) Flat fees. The following projects will receive a discount on project review fees:
(a) Installation of finishes only, one hundred fifty dollars;
(b) Change of approved use only, one hundred fifty dollars;
(c) The first submission for review and approval of the site installation of a mobile unit, five hundred seventy-five dollars. Each additional submission of the same project, two hundred eighty-five dollars;
(d) The first submission for review and approval of the equipment supplier of a mobile unit, five hundred seventy-five dollars. Each additional submission of the same project, two hundred eighty-five dollars;
(e) Each eight staff hours or fraction thereof for technical assistance, five hundred dollars. For technical assistance requiring travel, the program may increase the fee to include travel expenses;
(f) Special projects as determined by the program that requires minimal or highly repetitive review, five hundred dollars for every review or inspection after the initial review;
(g) Plan review and inspection for the on-site installation of the foundation, and hook-ups including, but not limited to, potable water, sewage disposal systems, or gas connections for factory assembled structures, two hundred fifty dollars per site visit regardless of the number of sites installed and completed at the time of inspection;
(h) On-site inspection and plan review for foundation pad for temporary structures including, but not limited to, tents and RVs, one hundred and twenty dollars per site visit regardless of the number of pads installed and completed at the time of inspection.
(5) Fee reductions. The program may decrease the project review fees, when:
(a) The project sponsor requests a reduction in the fee according to subsection (1) of this section;
(b) The project is prepared by a state licensed architect or engineer when architectural or engineering services are not required by rule. The project may qualify for a reduction of up to fifteen percent;
(c) A facility is converted from another occupancy as defined by the state building code; a facility is converted from one license to another; or, a facility that is currently unlicensed, but was previously licensed through the Washington state department of health or the Washington state department of social and health services, wishes to be reviewed for relicensure. The project may qualify for a reduction of up to fifty percent. The amount of fee reduction will be determined by the estimated amount of systems review required to ensure that the rules have been met.
(6) Total fee reductions may not exceed seventy percent of the original estimated project review fee.
(7) Refunds. The program shall refund fees paid when requested by the applicant as follows:
(a) The final attested project cost is less than the project estimated on the application. Fees paid may be refunded by the program according to the project fee table in subsection (2) of this section.
(b) If a project is canceled after an application and fee has been received but no plan review or technical assistance has been performed by the program, seventy-five percent of the fees paid.
(c) If a project is canceled after an application and fee has been received and plan review or technical assistance has been performed by the department, fifty percent of the fees paid.
(8) No fees paid by the applicant will be refunded after project cancellation if any of the following applies:
(a) More than two on-site visits, conferences, or plan reviews for any purpose have been performed by the program;
(b) One year has elapsed since an application and fee is received by the program, but no permit is issued because applicant failed to complete requirements for permit, and the applicant has not pursued the project in good faith;
(c) The amount to be refunded as calculated by subsection (7)(a), (b), or (c) of this section is one hundred twenty dollars or less;
(d) Approval or authorization to begin construction or a permit has been issued or construction has begun prior to a request from the applicant to cancel the project; or
(e) A written request has not been received to cancel the project.