WAC 246-359-060

WAC 246-359-060. Architect or engineer of record and plan submittal responsibilities

Last amended: 2016Year: 2026Length: 109 wordsOfficial source
(1) The department of health will require construction documents to be prepared by an architect or engineer for any construction described under: (a) WAC 246-359-600 , alternate construction; (b) WAC 246-359-710 , installation requirements for factory assembled structures; (c) WAC 246-359-720 , installation requirements for manufactured homes. (2) The applicant must provide the name of the architect or engineer of record on the construction permit application. (3) The applicant is responsible to notify the department of health, in writing, when the architect or engineer of record changes or is no longer able to review and coordinate all the necessary submittal documents for compatibility with the design of the building.
WAC 246-359-060: WAC 246-359-060. Architect or engineer of record and plan submittal responsibilities | Justis AI