WAC 296-150F-0230

WAC 296-150F-0230. What are the insignia application requirements?

Last amended: 2012Year: 2026Length: 157 wordsOfficial source
(1) If you are requesting insignia for units that you intend to manufacture under a new design plan, your completed application must include: (a) A completed design plan approval request form; (b) Two complete sets of design plans, specifications, engineering analysis, test procedures and results, plus one additional set for each manufacturing location where the design plan will be used; (c) At least one set of design plans must have an original wet stamp from a professional engineer or architect licensed in Washington state. We will retain the set with the original wet stamp; and (d) A one-time initial filing fee, the design plan fee (if we approve your design plan) and the fee for each insignia. (See WAC 296-150F-3000 .) (2) If you are requesting insignia under an approved design plan , your completed application must include: (a) A completed application for insignia form; and (b) The fee for each insignia requested. (See WAC 296-150F-3000 .)
WAC 296-150F-0230: WAC 296-150F-0230. What are the insignia application requirements? | Justis AI