WAC 296-150F-0550

WAC 296-150F-0550. Do you notify the local enforcement agency after your final inspection of factory-built structures at a manufacturing location?

Last amended: 1996Year: 2026Length: 62 wordsOfficial source
After we perform a final inspection of a factory-built, commercial structure, or component, we will send a notice to the local enforcement agency (NLEA) that: (1) Specifies what connections, standards, and incomplete items the local enforcement agency must check when the unit is installed; and/or (2) Estimates the expected time of arrival of the factory-built house or commercial structure to the site.
WAC 296-150F-0550: WAC 296-150F-0550. Do you notify the local enforcement agency after your final inspection of factory-built structures at a manufacturing location? | Justis AI