WAC 296-150F-3000
WAC 296-150F-3000. Factory-built housing and commercial structure fees
GENERAL INFORMATION Manufacture: Manufacturer # 1. Building use: 2. Building occupancy: 3. Type of construction: 4. Square footage of building: 5. Valuation of the building shall be based on the following: • Square footage of the building multiplied by the amount in the BVD valuation table . . . . $ . . . . . 6. Total valuation: . . . . $ . . . . . PERMIT FEE 7. Calculate from building permit fee table using the total valuation . . . . $ . . . . . STRUCTURAL PLAN REVIEW FEE* 8. One year design review: (Valid for one year) multiply the total on line 7 by 0.483 . . . . $ . . . . . 9. Master plan review: (Valid for the code cycle) multiply the total on line 7 by 0.690 . . . . $ . . . . . * Minimum plan review fee is 2 1/2 hours x $118.20 per hour FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required) 10. Fire and life-safety plan review: a. One year design—Multiply the total on line 7 by 0.206 . . . . $ . . . . . b. Master plan design—Multiply the total on line 7 by 0.343 . . . . $ . . . . . • Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy PLUMBING PLAN-REVIEW FEE 11. Plumbing $24.60 + $7.90 per fixture . . . . $ . . . . . 12. Medical gas $24.60 + $7.90 per gas outlet . . . . $ . . . . . DESIGN RENEWAL OR ADDENDUM 13. 13.82% of building permit + $118.20 . . . . $ . . . . . RESUBMITTAL 14. 13.82% of building permit + $118.20 . . . . $ . . . . . ELECTRICAL PLAN-REVIEW FEE 15. See WAC 296-46B-906 (9) for electrical review fees NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) 16. Notification to local enforcement agency fee: $ 50.70 INSIGNIA FEES 17. FIRST SECTION $ 378.30 18. EACH ADDITIONAL SECTION $ 33.60 TOTAL FEES 19. Total plan review fees: Add lines 8 or 9 and 10 through 15 . . . . $ . . . . . 20. Total fees due: Includes plan fees, insignia fees, and NLEA fees . . . . $ . . . . . 21. Total amount paid . . . . $ . . . . .
GENERAL INFORMATION
Manufacture:
Manufacturer #
1.
Building use:
2.
Building occupancy:
3.
Type of construction:
4.
Square footage of building:
5.
Valuation of the building shall be based on the following:
•
Square footage of the building multiplied by the amount in the
BVD valuation table . . . .
$
. . . . .
6.
Total valuation: . . . .
$
. . . . .
PERMIT FEE
7.
Calculate from building permit fee table using the total valuation . . . .
$
. . . . .
STRUCTURAL PLAN REVIEW FEE*
8.
One year design review:
(Valid for one year) multiply the total on line 7 by 0.483 . . . .
$
. . . . .
9.
Master plan review:
(Valid for the code cycle) multiply the total on line 7 by 0.690 . . . .
$
. . . . .
*
Minimum plan review fee is 2 1/2 hours x $118.20 per hour
FIRE AND LIFE-SAFETY PLAN REVIEW FEE (if required)
10.
Fire and life-safety plan review:
a.
One year design—Multiply the total on line 7 by 0.206 . . . .
$
. . . . .
b.
Master plan design—Multiply the total on line 7 by 0.343 . . . .
$
. . . . .
•
Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy
PLUMBING PLAN-REVIEW FEE
11.
Plumbing $24.60 + $7.90 per fixture . . . .
$
. . . . .
12.
Medical gas $24.60 + $7.90 per gas outlet . . . .
$
. . . . .
DESIGN RENEWAL OR ADDENDUM
13.
13.82% of building permit + $118.20 . . . .
$
. . . . .
RESUBMITTAL
14.
13.82% of building permit + $118.20 . . . .
$
. . . . .
ELECTRICAL PLAN-REVIEW FEE
15.
See WAC 296-46B-906 (9) for electrical review fees
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
16.
Notification to local enforcement agency fee:
$
50.70
INSIGNIA FEES
17.
FIRST SECTION
$
378.30
18.
EACH ADDITIONAL SECTION
$
33.60
TOTAL FEES
19.
Total plan review fees:
Add lines 8 or 9 and 10 through 15 . . . .
$
. . . . .
20.
Total fees due:
Includes plan fees, insignia fees, and NLEA fees . . . .
$
. . . . .
21.
Total amount paid . . . .
$
. . . . .
Square Foot Construction Costs (BVD Table) a, b, c, and d
Group (2009 International Building Code) IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 211.15 203.98 198.73 190.05 178.25 173.30 183.31 162.97 156.05 A-1 Assembly, theaters, without stage 193.16 185.99 180.74 172.06 160.31 155.36 165.32 145.04 138.12 A-2 Assembly, nightclubs 163.22 158.56 154.17 148.00 138.96 135.24 142.52 126.06 121.36 A-2 Assembly, restaurants, bars, banquet halls 162.22 157.56 152.17 147.00 136.96 134.24 141.52 124.06 120.36 A-3 Assembly, churches 195.10 187.93 182.68 174.00 162.21 157.26 167.26 146.94 140.02 A-3 Assembly, general, community halls, libraries, museums 163.81 156.64 150.39 142.71 129.91 125.96 135.97 114.63 108.71 A-4 Assembly, arenas 192.16 184.99 178.74 171.06 158.31 154.36 164.32 143.04 137.12 B Business 164.76 158.78 153.49 145.97 132.45 127.63 139.92 116.43 110.93 E Educational 176.97 170.85 165.64 158.05 146.37 138.98 152.61 127.91 123.09 F-1 Factory and industrial, moderate hazard 97.87 93.28 87.66 84.46 75.44 72.26 80.79 62.17 58.48 F-2 Factory and industrial, low hazard 96.87 92.28 87.66 83.46 75.44 71.26 79.79 62.17 57.48 H-1 High hazard, explosives 91.74 87.15 82.53 78.33 70.49 66.31 74.66 57.22 N.P. H-2, 3, 4 High hazard 91.74 87.15 82.53 78.33 70.49 66.31 74.66 57.22 52.53 H-5 HPM 164.76 158.78 153.49 145.97 132.45 127.63 139.92 116.43 110.93 I-1 Institutional, supervised environment 164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 I-2 Institutional, hospitals 277.07 271.09 265.80 258.28 243.90 N.P. 252.23 227.88 N.P. I-2 Institutional, nursing homes 193.00 187.02 181.74 174.22 160.98 N.P. 168.16 144.96 N.P. I-3 Institutional, restrained 187.72 181.73 176.45 168.93 156.64 150.82 162.87 140.63 133.13 I-4 Institutional, day care facilities 164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 M Mercantile 121.57 116.92 111.53 106.36 96.96 94.25 100.88 84.07 80.36 R-1 Residential, hotels 166.21 160.43 155.99 149.29 137.39 133.80 145.70 123.43 119.10 R-2 Residential, multiple family 139.39 133.61 129.17 122.47 111.23 107.64 119.54 97.27 92.94 R-3 Residential, one and two family 131.18 127.60 124.36 121.27 116.43 113.53 117.42 108.79 101.90 R-4 Residential, care/assisted living facilities 164.82 159.04 154.60 147.90 135.84 132.25 144.15 121.88 117.55 S-1 Storage, moderate hazard 90.74 86.15 80.53 77.33 68.49 65.31 73.66 55.22 51.53 S-2 Storage, low hazard 89.74 85.15 80.53 76.33 68.49 64.31 72.66 55.22 50.53 U Utility, miscellaneous 71.03 67.02 62.71 59.30 52.86 49.43 56.33 41.00 39.06
Group (2009
International Building Code)
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1 Assembly, theaters, with stage
211.15
203.98
198.73
190.05
178.25
173.30
183.31
162.97
156.05
A-1 Assembly, theaters, without stage
193.16
185.99
180.74
172.06
160.31
155.36
165.32
145.04
138.12
A-2 Assembly, nightclubs
163.22
158.56
154.17
148.00
138.96
135.24
142.52
126.06
121.36
A-2 Assembly, restaurants, bars, banquet halls
162.22
157.56
152.17
147.00
136.96
134.24
141.52
124.06
120.36
A-3 Assembly, churches
195.10
187.93
182.68
174.00
162.21
157.26
167.26
146.94
140.02
A-3 Assembly, general, community halls, libraries, museums
163.81
156.64
150.39
142.71
129.91
125.96
135.97
114.63
108.71
A-4 Assembly, arenas
192.16
184.99
178.74
171.06
158.31
154.36
164.32
143.04
137.12
B Business
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
E Educational
176.97
170.85
165.64
158.05
146.37
138.98
152.61
127.91
123.09
F-1 Factory and industrial, moderate hazard
97.87
93.28
87.66
84.46
75.44
72.26
80.79
62.17
58.48
F-2 Factory and industrial, low hazard
96.87
92.28
87.66
83.46
75.44
71.26
79.79
62.17
57.48
H-1 High hazard, explosives
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
N.P.
H-2, 3, 4 High hazard
91.74
87.15
82.53
78.33
70.49
66.31
74.66
57.22
52.53
H-5 HPM
164.76
158.78
153.49
145.97
132.45
127.63
139.92
116.43
110.93
I-1 Institutional, supervised environment
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
I-2 Institutional, hospitals
277.07
271.09
265.80
258.28
243.90
N.P.
252.23
227.88
N.P.
I-2 Institutional, nursing homes
193.00
187.02
181.74
174.22
160.98
N.P.
168.16
144.96
N.P.
I-3 Institutional, restrained
187.72
181.73
176.45
168.93
156.64
150.82
162.87
140.63
133.13
I-4 Institutional, day care facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
M Mercantile
121.57
116.92
111.53
106.36
96.96
94.25
100.88
84.07
80.36
R-1 Residential, hotels
166.21
160.43
155.99
149.29
137.39
133.80
145.70
123.43
119.10
R-2 Residential, multiple family
139.39
133.61
129.17
122.47
111.23
107.64
119.54
97.27
92.94
R-3 Residential, one and two family
131.18
127.60
124.36
121.27
116.43
113.53
117.42
108.79
101.90
R-4 Residential, care/assisted living facilities
164.82
159.04
154.60
147.90
135.84
132.25
144.15
121.88
117.55
S-1 Storage, moderate hazard
90.74
86.15
80.53
77.33
68.49
65.31
73.66
55.22
51.53
S-2 Storage, low hazard
89.74
85.15
80.53
76.33
68.49
64.31
72.66
55.22
50.53
U Utility, miscellaneous
71.03
67.02
62.71
59.30
52.86
49.43
56.33
41.00
39.06
a Private garages use utility, miscellaneous b Unfinished basements (all use group) = $15.00 per sq. ft. c For shell only buildings deduct 20 percent d N.P. = not permitted
a
Private garages use utility, miscellaneous
b
Unfinished basements (all use group) = $15.00 per sq. ft.
c
For shell only buildings deduct 20 percent
d
N.P. = not permitted
Table 1-A - Building Permit Fees
Total Valuation Fee $1.00 to $500.00 $23.50 $501.00 to $2,000.00 $23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 $25,001.00 to $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 $100,001.00 to $500,000.00 $993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 $500,001.00 to $1,000,000.00 $3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 $1,000,001.00 and up $5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
Total Valuation
Fee
$1.00 to $500.00
$23.50
$501.00 to $2,000.00
$23.50 for the first $500.00 plus $3.05 for each additional $100.00, or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00, or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000.00
$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00, or fraction thereof, to and including $50,000.00
$50,001.00 to $100,000.00
$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $100,000.00
$100,001.00 to $500,000.00
$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00, or fraction thereof, to and including $500,000.00
$500,001.00 to $1,000,000.00
$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00
$1,000,001.00 and up
$5,608.75 for the first $1,000,000.00 plus $3.65 for each additional $1,000.00, or fraction thereof
INITIAL FILING FEE (first time applicants) $92.20 DESIGN PLAN FEES: INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × 1.382* INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × 1.382* RENEWAL FEE - 10% of permit fee × 1.382 + $118.20 RESUBMIT FEE - 10% of permit fee × 1.382 + $118.20 ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × 1.382 + $118.20 PLUMBING PLAN FEE, $24.60 + PER FIXTURE FEE of $7.90 MEDICAL GAS PLAN FEE, $24.60 + PER OUTLET FEE of $7.90 Note: Mechanical systems are included in the primary plan fee FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy) MASTER DESIGN - 25% of permit fee × 1.382 One year design - 15% of the permit fee × 1.382 ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906 RECIPROCAL PLAN REVIEW: INITIAL FEE-MASTER DESIGN (minimum 3 hours) $118.20 per hour INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours) $118.20 per hour RENEWAL FEE (minimum 1 hour) $118.20 ADDENDUM (minimum 1 hour) $118.20 per hour PLANS APPROVED BY LICENSED PROFESSIONALS - 10% of permit fee × 1.382 + $118.20 FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM $118.20 per hour APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × 1.382 + $118.20 DEPARTMENT INSPECTION FEES INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***) $118.20 TRAVEL (Per hour**) $118.20 PER DIEM*** HOTEL**** MILEAGE*** RENTAL CAR**** PARKING**** AIRFARE**** DEPARTMENT AUDIT FEES: AUDIT (Per hour**) $118.20 TRAVEL (Per hour**) $118.20 PER DIEM*** HOTEL**** MILEAGE*** RENTAL CAR**** PARKING**** AIRFARE**** INSIGNIA FEES: FIRST SECTION $378.30 EACH ADDITIONAL SECTION $33.60 REISSUED-LOST/DAMAGED $92.20 OTHER FEES: FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***) $118.20 NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA) $50.70 PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request) $18.70 REFUND FEE $34.30
INITIAL FILING FEE (first time applicants)
$92.20
DESIGN PLAN FEES:
INITIAL FEE - MASTER DESIGN (code cycle), 50% of permit fee × 1.382*
INITIAL FEE - ONE YEAR DESIGN, 35% of permit fee × 1.382*
RENEWAL FEE - 10% of permit fee × 1.382 +
$118.20
RESUBMIT FEE - 10% of permit fee × 1.382 +
$118.20
ADDENDUM (approval expires on same date as original plan) - 10% of permit fee × 1.382 +
$118.20
PLUMBING PLAN FEE, $24.60 + PER FIXTURE FEE of
$7.90
MEDICAL GAS PLAN FEE, $24.60 + PER OUTLET FEE of
$7.90
Note: Mechanical systems are included in the primary plan fee
FIRE SAFETY PLAN REVIEW AS REQUIRED (Required for all structures that are more than 4,000 square feet and for all A, I, and H occupancy)
MASTER DESIGN - 25% of permit fee × 1.382
One year design - 15% of the permit fee × 1.382
ELECTRICAL PLAN REVIEW - Find fees @ http://apps.leg.wa.gov/wac/default.aspx?cite=296-46B-906
RECIPROCAL PLAN REVIEW:
INITIAL FEE-MASTER DESIGN (minimum 3 hours)
$118.20 per hour
INITIAL FEE-ONE YEAR DESIGN (minimum 2 hours)
$118.20 per hour
RENEWAL FEE (minimum 1 hour)
$118.20
ADDENDUM (minimum 1 hour)
$118.20 per hour
PLANS APPROVED BY LICENSED PROFESSIONALS - 10% of permit fee × 1.382 +
$118.20
FEES FOR RESUBMITTAL OF DESIGN PLANS APPROVED BY A PROFESSIONAL OR FIRM
$118.20 per hour
APPROVAL OF EACH SET OF DESIGN PLANS BEYOND FIRST THREE SETS - 5% of permit fee × 1.382 +
$118.20
DEPARTMENT INSPECTION FEES
INSPECTION/REINSPECTION (Per hour** plus travel time** and mileage***)
$118.20
TRAVEL (Per hour**)
$118.20
PER DIEM***
HOTEL****
MILEAGE***
RENTAL CAR****
PARKING****
AIRFARE****
DEPARTMENT AUDIT FEES:
AUDIT (Per hour**)
$118.20
TRAVEL (Per hour**)
$118.20
PER DIEM***
HOTEL****
MILEAGE***
RENTAL CAR****
PARKING****
AIRFARE****
INSIGNIA FEES:
FIRST SECTION
$378.30
EACH ADDITIONAL SECTION
$33.60
REISSUED-LOST/DAMAGED
$92.20
OTHER FEES:
FIELD TECHNICAL SERVICE (Per hour** plus travel time** and mileage***)
$118.20
NOTIFICATION TO LOCAL ENFORCEMENT AGENCY (NLEA)
$50.70
PUBLICATION PRINTING AND DISTRIBUTION OF RCWs AND WACs (One free copy per year upon request)
$18.70
REFUND FEE
$34.30
* Minimum plan review fee is 2 1/2 hours at the field technical service rate. ** Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments. *** Per state guidelines. **** Actual charges incurred.
*
Minimum plan review fee is 2 1/2 hours at the field technical service rate.
**
Minimum charge of 1 hour; time spent greater than 1 hour is charged in 1/2 hour increments.
***
Per state guidelines.
****
Actual charges incurred.