WAC 296-150T-0350

WAC 296-150T-0350. What must the test procedures and results for design plans include?

Last amended: 1999Year: 2026Length: 116 wordsOfficial source
(1) Tests to a design for a factory-built temporary worker housing structure must be witnessed by a professional engineer or architect licensed in Washington state. (2) Test reports must contain the following items: (a) A description of the methods or standards that applied to the test; (b) Drawings and a description of the item tested; (c) A description of the test set-up; (d) The procedure used to verify the correct load; (e) The procedure used to measure each condition; (f) Test data, including applicable graphs and observations of the characteristics and behavior of the item tested; and (g) Analysis, comments, and conclusion. (3) The written test procedures, results and conclusions must reference the applicable design plan.
WAC 296-150T-0350: WAC 296-150T-0350. What must the test procedures and results for design plans include? | Justis AI