WAC 296-155-56410
WAC 296-155-56410. Personnel platform lift planning and authorization form
Personnel Platform Lift Planning and Authorization Form 1. Location: Date: 2. Purpose of the Lift: 3. Hoisting Equip. Mfg: Model #: Serial: 4. Expected Radius: (maximum) (at work location) 5. (a) Rated Load at Radius: (b) Maximum Lift Load: [ 50% of 5(a)] 6. Platform ID: Platform Rating: 7. Platform Weight: Type: (Pin On) (Suspended) 8. (a) Number of Platform Occupants: (b) Approx. Wt. (With Equip.) 9. Total Lift Weight: [7 + 8(b)] [No more than 5(b) above] 10. Personnel Supervisor: 11. What are the Alternatives to This Lift? 12. Why are they not being used? 13. Pre-Lift Briefing Held (Date & Time): / / AM/PM Attendees: 14. Anticipated Hazards (wind, weather, visibility, power lines): 15. Lift Accomplished Date: Time: 16. Remarks: Employer Signature Date
Personnel Platform Lift Planning and Authorization Form
1.
Location:
Date:
2.
Purpose of the Lift:
3.
Hoisting Equip. Mfg:
Model #:
Serial:
4.
Expected Radius:
(maximum) (at work location)
5.
(a) Rated Load at Radius:
(b) Maximum Lift Load: [ 50% of 5(a)]
6.
Platform ID:
Platform Rating:
7.
Platform Weight:
Type: (Pin On)
(Suspended)
8.
(a) Number of Platform Occupants:
(b) Approx. Wt. (With Equip.)
9.
Total Lift Weight:
[7 + 8(b)] [No more than 5(b) above]
10.
Personnel Supervisor:
11.
What are the Alternatives to This Lift?
12.
Why are they not being used?
13.
Pre-Lift Briefing Held (Date & Time):
/ / AM/PM
Attendees:
14.
Anticipated Hazards (wind, weather, visibility, power lines):
15.
Lift Accomplished Date:
Time:
16.
Remarks:
Employer Signature
Date