0701-00 New dam construction: All operations in dam site area
Applies to:
Contractors engaged in the construction of new dams only, and includes all operations in the dam site area. A dam is a barrier built across a waterway to control the flow or level of water.
This classification includes all operations to construct a new dam in the dam site area. Constructing the foundation and structure includes, but is not limited to:
• Boring or tunneling;
• Caisson work;
• Earth and rock excavation;
• Erection of cofferdams;
• Erection of scaffolds;
• False work (temporary forms and support structures);
• Operation of concrete distribution apparatuses;
• Pile driving or shaft sinking;
• Placement of gates, turbines, control towers, and electrical wiring apparatus;
• Placement of reinforcing steel and rebar;
• Pouring and finishing concrete; and
• Setting and stripping of forms.
This classification also includes the incidental construction of fish ladders as part of the new dam construction project.
Exclusions:
• All other construction, service, or repair work done as part of an existing dam is classified in the classification applicable to the phase of construction work being performed.
• For example, the inspection of the foundation of an existing dam by divers is classified in 0202; the patching of cracks in the dam is classified in 0518.