WAC 296-24-24011

WAC 296-24-24011. Maintenance procedure

Last amended: 2016Year: 2026Length: 59 wordsOfficial source
(1) You must correct any unsafe conditions disclosed by the inspection requirements of this section before operation of the crane is resumed. Adjustments and repairs must be done only by designated personnel. (2) You must not operate the crane until all guards have been reinstalled, safety devices reactivated, and maintenance equipment removed after adjustments and repairs have been made.
WAC 296-24-24011: WAC 296-24-24011. Maintenance procedure | Justis AI