WAC 296-304-17001
WAC 296-304-17001. Visual inspection before tests
Before any test under this WAC 296-304-170 through 296-304-17023 is carried out, a visual inspection of the gear involved must be conducted and any visibly defective gear must be replaced or repaired. The provisions of WAC 296-304-16005 (4) must be adhered to.