WAC 296-307-45505

WAC 296-307-45505. Additional safeguards when constructing dip tanks

Last amended: 2020Year: 2026Length: 46 wordsOfficial source
(1) The employer must make sure the dip tank, drain boards (if provided), and supports are made of noncombustible material. (2) The employer must make sure piping connections on drains and overflow pipes allow easy access to the inside of the pipe for inspection and cleaning.
WAC 296-307-45505: WAC 296-307-45505. Additional safeguards when constructing dip tanks | Justis AI