WAC 296-400A-015

WAC 296-400A-015. What requirements must be met if a plumbing contractor changes its business structure, name, address, or designated plumber?

Last amended: 2021Year: 2026Length: 214 wordsOfficial source
(1) If a plumbing contractor changes its business structure (for example, from a partnership to a corporation or if the partners in a partnership change or change in the designated plumber that changes the scope of work that can be performed), the plumbing contractor must: (a) Apply for a new plumbing license as required in WAC 296-400A-011 ; and (b) Pay the plumbing license fee shown in WAC 296-400A-045 . (2) If a plumbing contractor changes its designated plumber without a change in the scope of work that can be performed, the plumbing contractor must: (a) Submit a new designated plumber form as required in WAC 296-400A-011 . (b) Pay the change designated plumber fee shown in WAC 296-400A-045 . (3) Failure to relicense after a change in business structure may invalidate the plumbing contractor's license. See RCW 18.106.410 . (4) If a licensed plumbing contractor changes its name, it must: (a) Notify the department, in writing, of the change; and (b) Pay the relicensing fee shown in WAC 296-400A-045 ; and (c) Submit to the department a name change rider or a new bond in the new name and a certificate of insurance in the new name. (5) If a licensed plumbing contractor changes its address, it must notify the department in writing.
WAC 296-400A-015: WAC 296-400A-015. What requirements must be met if a plumbing contractor changes its business structure, name, address, or designated plumber? | Justis AI