WAC 296-54-52003

WAC 296-54-52003. Cutting system inspection

Last amended: 2017Year: 2026Length: 77 wordsOfficial source
(1) The cutting system must be inspected before initial use during each workshift. Inspections must include: (a) The lubrication system for leaks or damage. (b) The chain for cracks or worn/damaged parts. (c) The bar for wear and straightness and ensure the tip is properly secured. (d) Sprocket. (e) Chain catcher if equipped; and (f) Chain shot guard if equipped. (2) You must repair defects or damage or the unserviceable machine must be replaced before beginning work.
WAC 296-54-52003: WAC 296-54-52003. Cutting system inspection | Justis AI