WAC 296-803-500

WAC 296-803-500. Summary

Last amended: 2017Year: 2026Length: 370 wordsOfficial source
Your responsibility: To make sure energy control procedures are used and include these requirements. You must meet the requirements… in this section: Energy Control Procedures Use energy control procedures WAC 296-803-50005 Applying Lockout or Tagout Devices Meet these requirements when applying lockout or tagout devices WAC 296-803-50010 Meet these additional requirements when applying lockout devices WAC 296-803-50015 Meet these additional requirements when applying tagout devices WAC 296-803-50020 Stored Energy Protect employees from the hazards of stored and residual energy WAC 296-803-50025 Verifying Machine Isolation Verify that the machine or equipment is safe before starting work WAC 296-803-50030 Removing Energy Control Devices Meet these requirements when removing lockout or tagout devices and energizing the machine or equipment WAC 296-803-50035 Temporary Energization Meet these requirements if it is necessary to temporarily energize a machine, equipment, or component for testing or positioning WAC 296-803-50040 Shift or Personnel Changes Protect employees during shift or personnel changes. WAC 296-803-50045 Group Lockout/Tagout Protect employees working in a group WAC 296-803-50050 Meet these additional requirements if more than one group is used WAC 296-803-50055 Outside Employers Coordinate with outside employers servicing or maintaining your machines or equipment WAC 296-803-50060 You must meet the requirements… in this section: Energy Control Procedures Use energy control procedures WAC 296-803-50005 Applying Lockout or Tagout Devices Meet these requirements when applying lockout or tagout devices WAC 296-803-50010 Meet these additional requirements when applying lockout devices WAC 296-803-50015 Meet these additional requirements when applying tagout devices WAC 296-803-50020 Stored Energy Protect employees from the hazards of stored and residual energy WAC 296-803-50025 Verifying Machine Isolation Verify that the machine or equipment is safe before starting work WAC 296-803-50030 Removing Energy Control Devices Meet these requirements when removing lockout or tagout devices and energizing the machine or equipment WAC 296-803-50035 Temporary Energization Meet these requirements if it is necessary to temporarily energize a machine, equipment, or component for testing or positioning WAC 296-803-50040 Shift or Personnel Changes Protect employees during shift or personnel changes. WAC 296-803-50045 Group Lockout/Tagout Protect employees working in a group WAC 296-803-50050 Meet these additional requirements if more than one group is used WAC 296-803-50055 Outside Employers Coordinate with outside employers servicing or maintaining your machines or equipment WAC 296-803-50060
WAC 296-803-500: WAC 296-803-500. Summary | Justis AI