WAC 296-870-30010

WAC 296-870-30010. Initial installation and after major modification inspection and testing

Last amended: 2015Year: 2026Length: 74 wordsOfficial source
(1) You must make sure a completed powered platform installation has been inspected and tested by the building owner: (a) Before it was first placed into service; and (b) Before it was returned to service after major modification was done. (2) You must make sure the inspection and tests determined that: (a) All parts of the installation met the applicable requirements of this chapter; and (b) All safety and operating equipment functioned as required.
WAC 296-870-30010: WAC 296-870-30010. Initial installation and after major modification inspection and testing | Justis AI