WAC 296-874-20044

WAC 296-874-20044. Control loads being hoisted near scaffolds

Last amended: 2015Year: 2026Length: 28 wordsOfficial source
You must use a tag line or equivalent measures to control loads being hoisted onto or near a scaffold if the load could swing and contact the scaffold.
WAC 296-874-20044: WAC 296-874-20044. Control loads being hoisted near scaffolds | Justis AI