WAC 296-876-600

WAC 296-876-600. Fixed ladder design and construction installed before December 1, 2006

Last amended: 2014Year: 2026Length: 180 wordsOfficial source
Summary Your responsibility: To make sure fixed ladders installed before December 1, 2006, meet design and construction requirements. You must meet the requirements... in this section: Design and construction — Fixed ladders installed before December 1, 2006. WAC 296-876-60005 Design loads WAC 296-876-60010 Pitch WAC 296-876-60015 Welding WAC 296-876-60020 Ladder surfaces WAC 296-876-60025 Rungs, cleats and steps WAC 296-876-60030 Side rails WAC 296-876-60035 Clearances WAC 296-876-60040 Step-across distance WAC 296-876-60045 Extensions and grab bars WAC 296-876-60050 Hatches WAC 296-876-60055 Platforms WAC 296-876-60060 Protective structures and equipment WAC 296-876-60065 Cages WAC 296-876-60070 Wells WAC 296-876-60075 Ladder safety devices WAC 296-876-60080 You must meet the requirements... in this section: Design and construction — Fixed ladders installed before December 1, 2006. WAC 296-876-60005 Design loads WAC 296-876-60010 Pitch WAC 296-876-60015 Welding WAC 296-876-60020 Ladder surfaces WAC 296-876-60025 Rungs, cleats and steps WAC 296-876-60030 Side rails WAC 296-876-60035 Clearances WAC 296-876-60040 Step-across distance WAC 296-876-60045 Extensions and grab bars WAC 296-876-60050 Hatches WAC 296-876-60055 Platforms WAC 296-876-60060 Protective structures and equipment WAC 296-876-60065 Cages WAC 296-876-60070 Wells WAC 296-876-60075 Ladder safety devices WAC 296-876-60080
WAC 296-876-600: WAC 296-876-600. Fixed ladder design and construction installed before December 1, 2006 | Justis AI