WAC 332-14-170

WAC 332-14-170. Plan of activities—Coal option contract

Last amended: 1985Year: 2026Length: 108 wordsOfficial source
The applicant for a coal option contract shall submit a plan of activities which shall include but is not limited to the following: (1) The type, location, and schedule of exploratory drilling and trenching activities; (2) Location of other significant activities, including type and depth of drilling, trenching, and adit construction; (3) Proposed roads; (4) Reclamation, including method of plugging and sealing drill holes and adits; (5) Proposed erosion control plans for roads, landings, drilling platforms, and trenches; and (6) Proximity to surface water including proposed stream crossings. If the holder of a coal option contract desires changes to the approved plan of activities, department approval is required.
WAC 332-14-170: WAC 332-14-170. Plan of activities—Coal option contract | Justis AI