WAC 344-12-205

WAC 344-12-205. Tubing

Last amended: 1985Year: 2026Length: 31 wordsOfficial source
Each flowing well shall be produced through tubing and shall be equipped with a master valve; however, a multiple completion is permissible when the production from each zone is kept separate.
WAC 344-12-205: WAC 344-12-205. Tubing | Justis AI