WAC 392-900-050

WAC 392-900-050. Construction cost allocation (CCA)

Last amended: 2016Year: 2026Length: 40 wordsOfficial source
The eligible construction cost in the STEM grant program shall be calculated by multiplying the approved square foot area of the projects as set forth in WAC 392-900-040 by the construction cost allocation as set forth in WAC 392-343-060 .
WAC 392-900-050: WAC 392-900-050. Construction cost allocation (CCA) | Justis AI