WAC 463-78-005

WAC 463-78-005. Adoption by reference

Last amended: 2020Year: 2026Length: 2,367 wordsOfficial source
(1) The energy facility site evaluation council adopts by reference the provisions in the chapters listed below in this section and the federal rules in WAC 463-78-115 as it existed on November 11, 2019. (2) The energy facility site evaluation council adopts by reference the following provisions of chapter 173-400 WAC in effect on the date in subsection (1) of this section with the following exceptions: (a) These provisions are not adopted by reference: (i) WAC 173-400-111 (5)(a) (last six words), (6), (9); (ii) WAC 173-400-730 (4); (iii) WAC 173-400-750 (2) second sentence; and (iv) The adoption date shall be November 11, 2019. (b) The terms "ecology," "authority," "director," and "permitting authority" in WAC 173-400-030 shall mean "the energy facility site evaluation council" unless a different meaning is plainly required by the context. WAC 173-400-025 : Adoption of federal rules. WAC 173-400-030 : Definitions. WAC 173-400-036 : Relocation of portable sources. WAC 173-400-040 : General standards for maximum emissions. WAC 173-400-050 : Emission standards for combustion and incineration units. WAC 173-400-060 : Emission standards for general process units. WAC 173-400-075 : Emission standards for sources emitting hazardous air pollutants. WAC 173-400-081 : Emission limits during startup and shutdown. WAC 173-400-091 : Voluntary limits on emissions. WAC 173-400-105 : Records, monitoring, and reporting. WAC 173-400-107 : Excess emissions. WAC 173-400-110 : New source review (NSR) for sources and portable sources. WAC 173-400-111 : Processing notice of construction applications for sources, stationary sources and portable sources. WAC 173-400-112 : Requirements for new sources in nonattainment areas. WAC 173-400-113 : Requirements for new sources in attainment or unclassifiable areas. WAC 173-400-114 : Requirements for replacement or substantial alteration of emission control technology at an existing stationary source. WAC 173-400-116 : Increment protection. WAC 173-400-117 : Special protection requirements for federal Class I areas. WAC 173-400-120 : Bubble rules. WAC 173-400-131 : Issuance of emission reduction credits. WAC 173-400-136 : Use of emission reduction credits (ERC). WAC 173-400-161 : Compliance schedules. WAC 173-400-171 : Public notice and opportunity for public comment. WAC 173-400-175 : Public information. WAC 173-400-180 : Variance. WAC 173-400-190 : Requirements for nonattainment areas. WAC 173-400-200 : Creditable stack height and dispersion techniques. WAC 173-400-205 : Adjustment for atmospheric conditions. WAC 173-400-700 : Review of major stationary sources of air pollution. WAC 173-400-710 : Definitions. WAC 173-400-720 : Prevention of significant deterioration (PSD). WAC 173-400-730 : Prevention of significant deterioration application processing procedures. WAC 173-400-740 : PSD permitting public involvement requirements. WAC 173-400-750 : Revisions to PSD permits. WAC 173-400-800 : Major stationary source and major modification in a nonattainment area. WAC 173-400-810 : Major stationary source and major modification definitions. WAC 173-400-820 : Determining if a new stationary source or modification to a stationary source is subject to these requirements. WAC 173-400-830 : Permitting requirements. WAC 173-400-840 : Emission offset requirements. WAC 173-400-850 : Actual emissions plantwide applicability limitation (PAL). WAC 173-400-860 : Public involvement procedures. WAC 173-400-025 : Adoption of federal rules. WAC 173-400-030 : Definitions. WAC 173-400-036 : Relocation of portable sources. WAC 173-400-040 : General standards for maximum emissions. WAC 173-400-050 : Emission standards for combustion and incineration units. WAC 173-400-060 : Emission standards for general process units. WAC 173-400-075 : Emission standards for sources emitting hazardous air pollutants. WAC 173-400-081 : Emission limits during startup and shutdown. WAC 173-400-091 : Voluntary limits on emissions. WAC 173-400-105 : Records, monitoring, and reporting. WAC 173-400-107 : Excess emissions. WAC 173-400-110 : New source review (NSR) for sources and portable sources. WAC 173-400-111 : Processing notice of construction applications for sources, stationary sources and portable sources. WAC 173-400-112 : Requirements for new sources in nonattainment areas. WAC 173-400-113 : Requirements for new sources in attainment or unclassifiable areas. WAC 173-400-114 : Requirements for replacement or substantial alteration of emission control technology at an existing stationary source. WAC 173-400-116 : Increment protection. WAC 173-400-117 : Special protection requirements for federal Class I areas. WAC 173-400-120 : Bubble rules. WAC 173-400-131 : Issuance of emission reduction credits. WAC 173-400-136 : Use of emission reduction credits (ERC). WAC 173-400-161 : Compliance schedules. WAC 173-400-171 : Public notice and opportunity for public comment. WAC 173-400-175 : Public information. WAC 173-400-180 : Variance. WAC 173-400-190 : Requirements for nonattainment areas. WAC 173-400-200 : Creditable stack height and dispersion techniques. WAC 173-400-205 : Adjustment for atmospheric conditions. WAC 173-400-700 : Review of major stationary sources of air pollution. WAC 173-400-710 : Definitions. WAC 173-400-720 : Prevention of significant deterioration (PSD). WAC 173-400-730 : Prevention of significant deterioration application processing procedures. WAC 173-400-740 : PSD permitting public involvement requirements. WAC 173-400-750 : Revisions to PSD permits. WAC 173-400-800 : Major stationary source and major modification in a nonattainment area. WAC 173-400-810 : Major stationary source and major modification definitions. WAC 173-400-820 : Determining if a new stationary source or modification to a stationary source is subject to these requirements. WAC 173-400-830 : Permitting requirements. WAC 173-400-840 : Emission offset requirements. WAC 173-400-850 : Actual emissions plantwide applicability limitation (PAL). WAC 173-400-860 : Public involvement procedures. (3) The energy facility site evaluation council adopts by reference the following provisions of chapter 173-401 WAC, in effect on the date referenced in subsection (1) of this section, with the following exceptions: (a) WAC 173-401-620 (2)(i) is not adopted by reference; and (b) The terms "ecology," "authority," "director," and "permitting authority" shall mean "the energy facility site evaluation council" unless a different meaning is plainly required by the context. WAC 173-401-100 : Program overview. WAC 173-401-200 : Definitions. WAC 173-401-300 : Applicability. WAC 173-401-500 : Permit applications. WAC 173-401-510 : Permit application form. WAC 173-401-520 : Certification. WAC 173-401-530 : Insignificant emission units. WAC 173-401-531 : Thresholds for hazardous air pollutants. WAC 173-401-532 : Categorically exempt insignificant emission units. WAC 173-401-533 : Units and activities defined as insignificant on the basis of size or production rate. WAC 173-401-600 : Permit content. WAC 173-401-605 : Emission standards and limitations. WAC 173-401-610 : Permit duration. WAC 173-401-615 : Monitoring and related recordkeeping and reporting requirements. WAC 173-401-620 : Standard terms and conditions. WAC 173-401-625 : Federally enforceable requirements. WAC 173-401-630 : Compliance requirements. WAC 173-401-635 : Temporary sources. WAC 173-401-640 : Permit shield. WAC 173-401-645 : Emergency provision. WAC 173-401-650 : Operational flexibility. WAC 173-401-700 : Action on application. WAC 173-401-705 : Requirement for a permit. WAC 173-401-710 : Permit renewal, revocation and expiration. WAC 173-401-720 : Administrative permit amendments. WAC 173-401-722 : Changes not requiring permit revisions. WAC 173-401-725 : Permit modifications. WAC 173-401-730 : Reopening for cause. WAC 173-401-750 : General permits. WAC 173-401-800 : Public involvement. WAC 173-401-810 : EPA Review. WAC 173-401-820 : Review by affected states. WAC 173-401-100 : Program overview. WAC 173-401-200 : Definitions. WAC 173-401-300 : Applicability. WAC 173-401-500 : Permit applications. WAC 173-401-510 : Permit application form. WAC 173-401-520 : Certification. WAC 173-401-530 : Insignificant emission units. WAC 173-401-531 : Thresholds for hazardous air pollutants. WAC 173-401-532 : Categorically exempt insignificant emission units. WAC 173-401-533 : Units and activities defined as insignificant on the basis of size or production rate. WAC 173-401-600 : Permit content. WAC 173-401-605 : Emission standards and limitations. WAC 173-401-610 : Permit duration. WAC 173-401-615 : Monitoring and related recordkeeping and reporting requirements. WAC 173-401-620 : Standard terms and conditions. WAC 173-401-625 : Federally enforceable requirements. WAC 173-401-630 : Compliance requirements. WAC 173-401-635 : Temporary sources. WAC 173-401-640 : Permit shield. WAC 173-401-645 : Emergency provision. WAC 173-401-650 : Operational flexibility. WAC 173-401-700 : Action on application. WAC 173-401-705 : Requirement for a permit. WAC 173-401-710 : Permit renewal, revocation and expiration. WAC 173-401-720 : Administrative permit amendments. WAC 173-401-722 : Changes not requiring permit revisions. WAC 173-401-725 : Permit modifications. WAC 173-401-730 : Reopening for cause. WAC 173-401-750 : General permits. WAC 173-401-800 : Public involvement. WAC 173-401-810 : EPA Review. WAC 173-401-820 : Review by affected states. (4) The energy facility site evaluation council adopts by reference the following provisions of chapter 173-406 WAC, in effect on the date referenced to in subsection (1) of this section. Part I - GENERAL PROVISIONS WAC 173-406-100 : Acid rain program general provisions. WAC 173-406-101 : Definitions. WAC 173-406-102 : Measurements, abbreviations, and acronyms. WAC 173-406-103 : Applicability. WAC 173-406-104 : New units exemption. WAC 173-406-105 : Retired units exemption. WAC 173-406-106 : Standard requirements. Part I - GENERAL PROVISIONS WAC 173-406-100 : Acid rain program general provisions. WAC 173-406-101 : Definitions. WAC 173-406-102 : Measurements, abbreviations, and acronyms. WAC 173-406-103 : Applicability. WAC 173-406-104 : New units exemption. WAC 173-406-105 : Retired units exemption. WAC 173-406-106 : Standard requirements. Part II - DESIGNATED REPRESENTATIVE WAC 173-406-200 : Designated representative. WAC 173-406-201 : Submissions. WAC 173-406-202 : Objections. Part II - DESIGNATED REPRESENTATIVE WAC 173-406-200 : Designated representative. WAC 173-406-201 : Submissions. WAC 173-406-202 : Objections. Part III - APPLICATIONS WAC 173-406-300 : Acid rain permit applications. WAC 173-406-301 : Requirement to apply. WAC 173-406-302 : Information requirements for acid rain permit applications. WAC 173-406-303 : Permit application shield and binding effect of permit application. Part III - APPLICATIONS WAC 173-406-300 : Acid rain permit applications. WAC 173-406-301 : Requirement to apply. WAC 173-406-302 : Information requirements for acid rain permit applications. WAC 173-406-303 : Permit application shield and binding effect of permit application. Part IV - COMPLIANCE PLAN WAC 173-406-400 : Acid rain compliance plan and compliance options. WAC 173-406-401 : General. WAC 173-406-402 : Repowering extensions. Part IV - COMPLIANCE PLAN WAC 173-406-400 : Acid rain compliance plan and compliance options. WAC 173-406-401 : General. WAC 173-406-402 : Repowering extensions. Part V - PERMIT CONTENTS WAC 173-406-500 : Acid rain permit. WAC 173-406-501 : Contents. WAC 173-406-502 : Permit shield. Part V - PERMIT CONTENTS WAC 173-406-500 : Acid rain permit. WAC 173-406-501 : Contents. WAC 173-406-502 : Permit shield. Part VI - PERMIT ISSUANCE WAC 173-406-600 : Acid rain permit issuance procedures. WAC 173-406-601 : General. WAC 173-406-602 : Completeness. WAC 173-406-603 : Statement of basis. WAC 173-406-604 : Issuance of acid rain permits. Part VI - PERMIT ISSUANCE WAC 173-406-600 : Acid rain permit issuance procedures. WAC 173-406-601 : General. WAC 173-406-602 : Completeness. WAC 173-406-603 : Statement of basis. WAC 173-406-604 : Issuance of acid rain permits. Part VII - PERMIT REVISIONS WAC 173-406-700 : Permit revisions. WAC 173-406-701 : General. WAC 173-406-702 : Permit modifications. WAC 173-406-703 : Fast-track modifications. WAC 173-406-704 : Administrative permit amendment. WAC 173-406-705 : Automatic permit amendment. WAC 173-406-706 : Permit reopenings. Part VII - PERMIT REVISIONS WAC 173-406-700 : Permit revisions. WAC 173-406-701 : General. WAC 173-406-702 : Permit modifications. WAC 173-406-703 : Fast-track modifications. WAC 173-406-704 : Administrative permit amendment. WAC 173-406-705 : Automatic permit amendment. WAC 173-406-706 : Permit reopenings. Part VIII - COMPLIANCE CERTIFICATION WAC 173-406-800 : Compliance certification. WAC 173-406-801 : Annual compliance certification report. WAC 173-406-802 : Units with repowering extension plans. Part VIII - COMPLIANCE CERTIFICATION WAC 173-406-800 : Compliance certification. WAC 173-406-801 : Annual compliance certification report. WAC 173-406-802 : Units with repowering extension plans. Part IX - NITROGEN OXIDES WAC 173-406-900 : Nitrogen oxides emission reduction program. Part IX - NITROGEN OXIDES WAC 173-406-900 : Nitrogen oxides emission reduction program. Part X - SULFUR DIOXIDE OPT-IN WAC 173-406-950 : Sulfur dioxide opt-ins. Part X - SULFUR DIOXIDE OPT-IN WAC 173-406-950 : Sulfur dioxide opt-ins. (5) The energy facility site evaluation council adopts by reference the following provisions of chapter 173-460 WAC, in effect on the date referenced in subsection (1) of this section. WAC 173-460-010 : Purpose. WAC 173-460-020 : Definitions. WAC 173-460-030 : Applicability. WAC 173-460-040 : New source review. WAC 173-460-050 : Requirement to quantify emissions. WAC 173-460-060 : Control technology requirements. WAC 173-460-070 : Ambient impact requirement. WAC 173-460-080 : First tier review. WAC 173-460-090 : Second tier review. WAC 173-460-100 : Third tier review. WAC 173-460-140 : Remedies. WAC 173-460-150 : Table of ASIL, SQER, and de minimis emission values. WAC 173-460-010 : Purpose. WAC 173-460-020 : Definitions. WAC 173-460-030 : Applicability. WAC 173-460-040 : New source review. WAC 173-460-050 : Requirement to quantify emissions. WAC 173-460-060 : Control technology requirements. WAC 173-460-070 : Ambient impact requirement. WAC 173-460-080 : First tier review. WAC 173-460-090 : Second tier review. WAC 173-460-100 : Third tier review. WAC 173-460-140 : Remedies. WAC 173-460-150 : Table of ASIL, SQER, and de minimis emission values. (6) The energy facility site evaluation council adopts by reference the following provisions of chapter 173-441 WAC, in effect on the date referenced in subsection (1) of this section. WAC 173-441-010 : Scope. WAC 173-441-020 : Definitions. WAC 173-441-030 : Applicability. WAC 173-441-040 : Greenhouse gases. WAC 173-441-050 : General monitoring, reporting, recordkeeping and verification requirements. WAC 173-441-060 : Authorization and responsibilities of the designated representative. WAC 173-441-070 : Report submittal. WAC 173-441-080 : Standardized methods and conversion factors incorporated by reference. WAC 173-441-085 : Third-party verification. WAC 173-441-086 : Assigned emissions level. WAC 173-441-090 : Compliance and enforcement. WAC 173-441-100 : Addresses. WAC 173-441-110 : Fees. WAC 173-441-120 : Calculation methods incorporated by reference from 40 C.F.R. Part 98 for facilities. WAC 173-441-130 : Calculation methods for suppliers. WAC 173-441-140 : Petitioning ecology to use an alternative calculation method to calculate greenhouse gas emissions. WAC 173-441-150 : Confidentiality. WAC 173-441-160 : Ecology to share information with local air authorities and with the energy facility site evaluation council. WAC 173-441-170: Severability. WAC 173-441-010 : Scope. WAC 173-441-020 : Definitions. WAC 173-441-030 : Applicability. WAC 173-441-040 : Greenhouse gases. WAC 173-441-050 : General monitoring, reporting, recordkeeping and verification requirements. WAC 173-441-060 : Authorization and responsibilities of the designated representative. WAC 173-441-070 : Report submittal. WAC 173-441-080 : Standardized methods and conversion factors incorporated by reference. WAC 173-441-085 : Third-party verification. WAC 173-441-086 : Assigned emissions level. WAC 173-441-090 : Compliance and enforcement. WAC 173-441-100 : Addresses. WAC 173-441-110 : Fees. WAC 173-441-120 : Calculation methods incorporated by reference from 40 C.F.R. Part 98 for facilities. WAC 173-441-130 : Calculation methods for suppliers. WAC 173-441-140 : Petitioning ecology to use an alternative calculation method to calculate greenhouse gas emissions. WAC 173-441-150 : Confidentiality. WAC 173-441-160 : Ecology to share information with local air authorities and with the energy facility site evaluation council. WAC 173-441-170: Severability.
WAC 463-78-005: WAC 463-78-005. Adoption by reference | Justis AI